• construction timeline for Farmington View

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Projected budget: $6.0 million

    Summer 2021

    Farmington View will be undergoing renovations in summer 2021 that include:

    • safety and seismic upgrades
    • window and HVAC equipment replacements and upgrades
    • ADA upgrades
    • roofing
    • parent/bus dropoff area improvements

    Several trees were already cut in fall 2020 to prepare for the dropoff improvements.

    The entry vestibule also will be renovated to improve monitoring and limit entry into the school building.

    Completed Projects

    • New Playground

    Students were excited about their new playground upgrades that promote healthy play and exercise. The play structure, with ground-level ADA-accessible activities, was installed in summer 2018 on a safer, padded tile surface, and has an accompanying all-weather, synthetic turf play area.

    • Flexible Furniture

    New flexible furniture (FFE) was delivered to the school in summer 2018. Research has shown that this type of furniture helps stimulate student engagement and learning.

    • Modular Building

    The existing portables were replaced with a new permanent, modular building that includes two classrooms and restrooms. The modular building was installed in summer 2018.

Contractors

  • Project Manager

    Cornerstone Management Group

    • John Abel

    Architect/Engineer

    • Building, dropoff improvements: Mahlum Architects / AKS Engineering
    • Entry vestibule: Axis Architects

    General Contractor

    • Building, dropoff improvements: Emerick Construction (CM/GC)
    • Entry vestibule: tbd