Aug. 8, 2022

  • Photos 1 and 2: the new doors have been added to the vestibule doorway.

    doors added to vestibule

    new vestibule doors facing toward entry

    Comments (-1)

Aug. 2, 2022

  • Photos 1 and 2: glazing has been added to the new vestibule doorway; installation of new doors and the rest of the security wiring are next.

    glazed vestibule doorway

    new vestibule doorway toward office

July 25, 2022

  • Photos 1 and 2: frames have been added to the new vestibule doorway.

    framed vestibule doorway

    framed doorway toward office

July 11, 2022

  • Photos 1 and 2: every new vestibule doorway is customized to accommodate each school's specific requirements. Construction at Orenco progresses with installation of security pathways and sheetrocking over the doorway frame.

    sheetrocked vestibule doorway

    vestibule doorway under construction at Orenco

June 27, 2022

  • Photo 1: the front entrance to the school already has security measures such as a video doorbell and card access.

    front entrance to school

    Photo 2: a second, interior doorway is being framed to provide an additional security barrier into the rest of the building.

    framing for interior doorway

    Photos 3 and 4: lockable gates were added last month to the new fencing to secure the perimeter of the playground area.

    gate into playground area

    gate into playground area

March 25, 2022

  • The new security fence has been installed on the west side of the playground.

    installed fence looking north

    installed fence looking south

    installed fence along playground

March 21, 2022

  • Installation of new security fencing next to the playground is taking place over spring break.

    crew installing fence posts

    fence line along playground