Photos 1-2: pending installation and wiring of the final door, the Patterson entry vestibule is nearly complete.
Aug. 10, 2022
Photos 1-3: doors are being installed; they will be wired shortly to the security system, including card access for entry into the heart of the building.
Aug. 3, 2022
Photos 1 and 2: storefront glass has been added to the new doorframes. Installation of the doors and completion of the security wiring are coming soon.
July 27, 2022
Photos 1 and 2: doorframes have been added to the new vestibule doorway.
Photos 3 and 4: as part of another project to enhance security of the campus, new fencing and gates have been installed around the perimeter.
July 13, 2022
Photos 1 and 2: sheetrock has been added to the framing for the new vestibule doorway.
June 29, 2022
Photo 1: the front entrance is currently closed due to construction.
Photos 2 and 3: inside the entry vestibule, framing has been constructed for the second set of doors that will secure the rest of the building.