Reedville Project Archive
-
Commemorative Art Unveiling
On Sept. 22, 2021, local artist Martin Conley unveiled the commemorative art piece he made out of original wood flooring from the Reedville building prior to renovations that began in 2019.
Read more...
-
A New Campus Look
BEFORE AFTER Oct. 14, 2018 The addition of the modular building, new playground and parent/bus dropoff area has changed the look of the Reedville campus, at least from the outside. Lawn areas are being reseeded, and landscaping has been added in the newly-constructed areas.
-
August 29, 2018 - Delayed Opening
The start of school is being delayed until September 6 to provide additional time for our contractors to complete the last of their summer projects, clean up and make sure the property is safe for students and staff, and to allow our teachers time to prepare their classrooms.
Read the letter to families
-
August 14, 2018
-
August 7, 2018
-
July 31, 2018
-
July 26, 2018
Eleven sections were assembled to create Reedville's new modular building. The building will house the new kitchen, cafeteria and five classrooms.
Next, crews will place the roof and siding, and finish the interior of the building.
-
July 24, 2018
-
July 10, 2018
-
July 3, 2018
-
June 26, 2018
-
Construction Begins
June 18, 2018 - as soon as the school year ended, contractors began their work on the main building.
-
"Reedville Renewal"
article by Olivia Singer, Hillsboro Tribune, published May 30, 2018.
-
Reedville Portable Demolition
On May 15, 2018, demolition of the first of three surplus portables took place at Reedville Elementary School. Past their useful lives, the portables were being demolished to make way for a new modular building for Reedville as part of the HSD Bond projects. The action is accelerated to 20 times the actual speed. -
Reedville Portable Move
On May 11, 2018, the first of two salvageable portables was moved from Reedville Elementary School. This was the launch of an HSD Bond project to install a new modular building at the school. This portable was moved to and will be reused at North Plains Elementary School; the second to Patterson Elementary School. This video compresses about 1.5 hours of work into a minute, the action is shown at about eight times the actual speed.
Milestones
-
Sept. 6, 2018 - the remodeled school opens for the first day of school, after a two-day delay to complete construction tasks and allow teachers to prepare their classrooms.
-
July 26, 2018 - assembly of the modular building was completed.
-
June 15, 2018 - as soon as the school year ended, contractors began work inside the main building. In the former portables area, they are preparing the soil for the foundation of the new modular building.
-
May 15, 2018 - first of three surplus portables demolished.
-
May 11, 2018 - First of two reusable portables moved.