Jan. 5, 2023

  • Photos 1-4: the fencing project has been completed with the addition of locks that prevent entry to the field area during school hours.

    gate with lock

    lockable gate near side entrance

    view of finished fencing toward playground

    view of finished fencing along perimeter of parking lot

    Comments (-1)

Dec. 15, 2022

  • Photo 1: fencing mesh and lockable gates have been added at the side entrance and fire lane.

    fencing and gates at fire lane

    Photo 2: the fencing continues along the perimeter of the play field area to enclose it and securely separate it from the parking lot.

    fencing encloses play field area

    Photo 3: a gate at the southeast edge of the play field will have locking hardware added to prevent entry during school hours.

    new fencing and gate at southeast edge of play field

Nov. 23, 2022

  • Photos 1 and 2: posts have been installed to add fencing along the perimeter of the play field to separate students from the parking lot and better secure the campus.

    fencing posts installed around play field near building

    fencing posts installed around play field along parking lot

    Photo 3: fencing fabric has been added to the new fence at the front of the school.

    new fencing at front of school

Nov. 11, 2022

  • Photos 1 and 2: additional fencing is being installed along the perimeter of the south front of the campus to further secure this side.

    fencing posts installed at front edge of school

    fencing posts installed

Aug. 9, 2022

  • Photos 1 and 2: security hardware installation and wiring for the new vestibule doorway have been completed. The doors and card entry access have been tested and are fully operational.

    security-wired vestibule doors

    view of new doorway toward main entry

Aug. 2, 2022

  • Photos 1 and 2: the new vestibule doorway is nearly complete. Once the card access reader and other security wiring are finished, the doorway will provide an extra barrier against unauthorized persons.

    nearly-complete vestibule doorway

    view of new doorway toward main entry

July 26, 2022

  • Photos 1 and 2: frames have been installed for the new vestibule doorway.

    view of new doorframes from entry

    view of new doorframes toward entry

July 19, 2022

  • Photos 1 and 2: a crew member prepares for painting of the vestibule doorway, laying down protective tarp and taping around the edges.

    laying painting tarp

    taping around doorway for painting

July 12, 2022

  • Photos 1 and 2: sheetrock has been added over the framing for the new vestibule doorway. Security pathways are being installed for hooking up the new doors.

    sheetrocked vestibule doorway

    security pathways in vestibule frame

June 28, 2022

  • Photo 1: the front entry is closed while the entry vestibule is renovated to upgrade security and limit entry into the rest of the building.

    front entrance

    Photos 2-3: framing for the second set of doors in the vestibule has been constructed.

    framing for second set of doors

    view toward exterior doors