Aug. 6, 2019

  • Photo 1: installation of acoustic tile and electrical conduit in the gym is nearly complete.

    gym renovation

    Photo 2: the old boiler has been replaced by a much more efficient (and smaller!) unit.

    replacement for old boiler

    Photo 3: new drywall and paint cover up the updated domestic water pipe inside the wall.

    domestic water pipe replacement in bathroom

    Photo 4: a crew member fine tunes an HVAC unit in one of the offices.

    tuning of office HVAC unit

    Photo 5: a hallway looks brighter with new paneling and fresh paint.

    hallway renovation

    Comments (-1)

July 23, 2019

  • Photos 1 and 2: a renovated classroom starts getting the finishing touches with new wall panels and paint; upgraded HVAC ductwork overhead, along with digital controls, will provide more efficient ventilation.

    renovated classroom gets finishing touches

    HVAC ductwork overhead

    Photo 3: new roofing is being installed.

    roofing work

    Photo 4: a worker installs acoustical tiles on the wall of the gym that will help dampen noise.

    installation of acoustical tiles in the gym

July 9, 2019

  • Photo 1: The gym has been renovated and primed.

    Renovated and primed gym

    Photo 2: Roofing work continues.

    Roofing work

    Photo 3: The old boiler has been removed.

    Old boiler removed

    Photo 4: Crew brings in material for the kitchen ceiling.

    Bringing in ceiling panel

    Photos 5 and 6: Classroom walls are replaced with new backing and sheetrock.

    Replacing classroom walls

    Newly-sheetrocked classroom walls

    Photo 7: New conduit brings in updated safety and electrical wiring.

    Conduit replacement

    Photo 8: Domestic water pipes are being replaced.

    Bathroom pipe replacement

June 17, 2019

  • Crews are dismantling the old boiler, and will be removing it to prepare for installation of HVAC upgrades and controls. According to Laurie Lux, school office manager, the boiler was repurposed from a WWII ship when the school was built in 1948.

    Dismantling old boiler

    Work continues in the gym.

    Construction work in gym

    Teachers pack up their classroooms before work begins in the main building this summer.

    Classroom packing

May 10, 2019

  • Crews have started working on the gym to implement seismic, HVAC and other improvements.

    Work on gym improvements

    Work on gym improvements

Milestones

  • May 6, 2019 - project crews have started mobilizing for the first phase of building renovations.