Dec. 29, 2022

  • Photos 1-2: all of the new garage doors have been installed on the mechanical bays.

    long view of new garage doors

    completed installation of garage doors

    Comments (-1)

Dec. 20, 2022

  • Photos 1-3: new garage doors have arrived and are being installed as part of the building improvements.

    long view of garage door replacements

    installing tall garage door

    interior view of garage door replacement

Aug. 4, 2022

  • Photos 1 and 2: concrete has been sealed, and the new hydraulic lifts are covered while electrical connections are completed.

    covered hydraulic lifts

    covered hydraulic lifts

    Photos 3 and 4: painting is being completed around the new sliding glass window and rolling window in the dispatchers' office.

    dispatchers' sliding glass window

    dispatchers' rolling window

July 26, 2022

  • Photos 1 and 2: the new hydraulic lifts are being installed in their pits.

    hydraulic lift pit

    installing hydraulic lift in pit

    Photo 3: the storage area for waste oil has been finished off with a cover and protective bollards.

    waste oil storage area

    Photo 4: the new skylights bring much-needed natural daylighting into the mechanics' bays.

    finished skylights in mechanics' bays

    Photo 5: glazing has been added to the dispatchers' office window.

    window for dispatchers' office

July 19, 2022

  • Photos 1 and 2: materials are loaded onto the rooftop in preparation for roofing work.

    roofing materials

    lifting materials to rooftop

    Photo 3: the pits for the hydraulic lifts are ready for their upcoming installation.

    empty hydraulic lift pit

July 8-12, 2022

  • Photos 1 and 2: skylights are being added to the roof of the mechanics' bays to bring in more natural daylighting.

    aerial view of skylight installation

    crew members installing skylights

    Photo 3: as seen from below, the skylights have a screen that prevents anyone on the rooftop from falling through.

    skylight and screen seen from below

    Photo 4: a crew member works on adjustments beneath a skylight.

    crew member working beneath skylight

    Photo 5: the concrete floor in the mechanics' bay is dried and finished; the hydraulic lifts are expected to be installed next week.

    finished concrete floor

    Photo 6: a new window is being added to the dispatchers' office area to add daylighting.

    window cutout in dispatchers' area

July 1, 2022

  • Photos 1 and 2: concrete for the floor has been poured and is being smoothed by crew members.

    poured concrete for floor

    smoothing out poured concrete

June 28, 2022

  • Photos 1 and 2: rebar has been installed to prepare for an upcoming concrete slab pour for the floor.

    rebar laid for concrete pour

    rebar for concrete floor

    Photo 3: conduit also has been laid in a trench for electrical connections between the hydraulic lifts and power source.

    conduit in trench

    Photo 4: a crew member wires secured door access to the security system.

    wiring security system

June 21, 2022

  • Photo 1: a crew member trims along the edges of the walls of the left-side concrete base for a hydraulic lift.

    trimming along edges of concrete slab

    Photo 2: the right-side trench is ready for installation of a lift.

    right-side lift slab

    Photo 3: the tank for waste motor oil is being installed in an excavated trench.

    tank installed in trench

June 14, 2022

  • Photo 1: concrete slabs have been poured in the trenches for the new lifts.

    left-side slab pour

    Photo 2: crew members touch up the concrete slab pour in the right-side trench.

    right-side slab pour

    Photo 3: additional boring and excavation for another trench is taking place outside the bay.

    additional trench outside bay

June 7, 2022

  • Photos 1 and 2: trenches have been dug in the mechanical bays for the new lifts.

    left-side trench in mechanical bays

    right-side trench in mechanical bays

    Photo 3: rebar has been laid out to install in the trench framing to support the upcoming concrete pour.

    rebar for trenches

May 26, 2022

  • Concrete has been removed from a mechanics' bay to prepare for digging and other work to install new lifts.

    concrete removed from mechanics bay

May 19, 2022

  • Building renovations are underway, starting with sawcutting of the concrete floors in the mechanics' bays to prepare for installation of new lifts and other equipment.

    Start of sawcutting in mechanics bay