• Construction will occur in phases beginning in spring 2019 through summer 2020. During the school year, when a phase begins, the associated areas (shaded in red in the phasing plan below) will be cordoned off and inaccessible to students and school staff. During the summer, nearly all of the campus may be closed for construction. For everyone's safety, do not enter construction zones.

Construction Phasing Plan (PDF)

If you are having trouble viewing the document, you may download the document.