Sept. 21, 2020

Sept. 2, 2020

  • Roofing work continues over the small area of the building.

    re-roofing work continues

Aug. 25, 2020

  • A small re-roofing project has begun above the center of the building.

    re-roofing work

    roofers at work

Sept. 16, 2019

  • The new entryway has been installed at the front of the school. After the school day begins, all doors are locked, and visitors and late students will need to check in with the office. ID will be required for viewing and verification through the "doorbell" before the receptionist will buzz you in.

    Photo 1: the new entryway welcomes visitors to check in.

    new entryway at the front of the school

    Photo 2: on the other side of the door is the reception area and main office.

    reception area

Aug. 23, 2019

  • Photos 1 and 2: work continues on installing the new secured entry at the front of the school.

    installation of new entryway

    reception area-side construction of entryway

    Photos 3-5: the early childhood education space received a new viewing window, a covered observation patio and fencing to enclose the play area.

    new viewing window in ECE classroom

    observation patio

    fencing around play area

    Photos 6-7: culinary arts classrooms received upgrades to bring them up to industry standards.

    new hoods and ranges in culinary arts classroom

    finishing up in culinary arts classroom

Aug. 5, 2019

  • Photo 1: the new entryway is framed.

    construction of new entry

    Photo 2: the culinary arts preparation area is being renovated with new hoods, finishes and upgraded power to bring it up to industry standards

    culinary arts room renovations

    Photo 3: renovations to the early childhood education spaces will add security fencing and observation areas

    early childhood education area renovations

July 16, 2019

  • Photo 1: the new chiller has been installed and is expected to start up on July 22, with commissioning (testing/evaluation) the following week.

    new chiller unit

    Photo 2: wiring for the security system has been threaded through the conduits over the doors.

    Wiring for security system

July 8, 2019

  • Photo 1: Work begins on creating a new entryway.

    Photo 2: Entry security measures are being installed at all entrances/exits, including the ones leading out to the student parking lot.

    Front office entry renovations

    Parking lot entrance being wired for security

June 24, 2019

  • Photo 1: Part of the main office is being demolished to prepare for a new, secured entrance.

    Photo 2: Wiring is being installed throughout the building as part of security upgrades.

    Front office demolition work

    Installation of wiring