Sep. 19, 2019

  • Renovations at Century are now in use as the school year has started.

    A drop-down cage has been added to the student store to secure the inside during off-hours.

    student store - finished

    Updated power and cable management line the ceilings of the engineering classroom.

    engineering classroom - finished

    The culinary arts classroom, although waiting for complete closeout at this time, has new hoods and ranges in a kitchen now up to industry standards.

    culinary classroom

    Comments (-1)

Aug. 16, 2019

  • Photo 1: electric upgrades and overhead cable management installation are nearly complete.

    graphic design classroom

    Photo 2: ranges and hoods have been installed in the culinary classrooms.

    new ranges and hoods in culinary classroom

    Photo 3: cabinetry, finishes and paint refresh the renovated student store.

    renovated student store

Aug. 7, 2019

  • Work continues to complete the career-technical spaces.

    Photos 1-3: in the culinary spaces, ventilation and power have been upgraded, and appliances are in the hallway ready to be installed.

    culinary classroom renovation

    culinary classroom renovaton

    appliances for culinary classrooms

    Photo 4: graphic design classroom renovation is wrapping up, with transparency windows and overhead power/cable management installed.

    graphic design classroom renovation

    Photos 5-6: the student store renovation is nearly done, and cabinetry will be installed shortly.

    student store renovation

    cabinetry for student store

     

July 12, 2019

  • In career-technical classrooms, such as these on the north wing of the school, work is being done to add transparency, power/cable management, and collaborative walls, among other improvements.

    Interior wall exposing conduit

    Classroom hallway under renovation

    Framing of classroom

    Framing of classroom