Aug. 4, 2020

  • Photo 1: forms are prepared for an upcoming concrete pour of the gym benches.

    concrete bench forms

    Photo 2: parts of the interior, including HVAC ductwork, are still accessible from the outside.

    gym exterior, northeast corner

    Photo 3: this aerial view shows curbwork in the parking lots and gym construction on the site so far.

    aerial view of construction site

    Comments (-1)

July 20, 2020

  • Photos 1-2: work on the interior of the gym continues as: (1) frames are being trimmed for walls; and (2) insulation is being secured to the walls.

    trimming framing for gym walls

    securing insulation to walls

    Photos 3-4: view of the gym interior facing east and framing for the mechanical area (mezzanine), PE office and restrooms.

    view of gym interior facing east

    framing for gym rooms

    Photo 5: this aerial view shows the construction work on the school campus, including the bus and parent dropoff areas as well as the gym building.

    aerial view of campus construction work

July 13, 2020

  • Photos 1-3: curbs have been poured and base gravel is being added to the renovated bus loading zone and new parent dropoff/parking lot.

    aerial view of bus loading zone renovation

    heavy equipment grade bus loading zone

    aerial view of parent dropoff/parking lot

    Photo 4: crew members are nearly finished with installation of the exterior wall panels.

    installation of exterior wall panels

    Photo 5: a crew member washes off the finished brick masonry on the gym.

    washing brick masonry

    Photo 6: framing on the ceiling and walls is being installed in the interior of the gym.

    interior view of gym

July 6, 2020

  • Photo 1: work continues to complete the exterior siding and to touch up the brickwork.

    view of construction work on northeast corner of gym

    Photo 2: an aerial view of the whole site shows excavation of the bus dropoff loop at the bottom and construction of the gym and parent dropoff/parking lot near the top of the photo.

    aerial view of site facing west

    Photo 3: the bus loop has been excavated at the front of the school; gravel awaits grading.

    excavated bus loop in front of school

    Photo 4: interior view of gym facing the front entry. A wall and floor has been constructed for the mezzanine area that will hold mechanical units.

    interior view of gym facing front entry

June 30, 2020

  • Photos 1-2: the interior of the gym building is nearly enclosed. The entryway, restrooms and PE office are framed at the front (east side) of the gym.

    interior view of gym to the west

    interior view of gym to the east

    Photo 3: roofing and exterior work continue at the front of the gym.

    front exterior of gym

    Photo 4: an aerial view of the roofing and brickwork being performed on the north side of the gym exterior.

    aerial view of north side of gym work

    Photo 5: an aerial view of the bus dropoff construction. Old asphalt has been removed.

    aerial view of bus dropoff construction

June 24, 2020

  • Photos 1-3: sheathing, siding and brick are being installed on the exterior of the gym.

    aerial view of gym exterior work

    bricklayers

    siding installation

    Photos 4-5: the bus dropoff area is being renovated.

    aerial view of bus dropoff area under construction

    asphlat pieces being removed from bus dropoff area

June 15, 2020

  • All the roof panels over the gym structure have been installed, and installation of the exterior wall panels continues.

    roof panels installed over gym

    exterior view of gym construction

June 8-9, 2020

June 3, 2020

  • Photo 1: painting of the side beams is nearly complete and has started on the ceiling beams (view to the rear of the gym).

    view of painted structural beams

    Photo 2: the front view of the gym shows remaining beams to be painted.

    aerial front view of gym

    Photo 3: an aerial view of the site shows crews doing fine grading of the new dropoff/parking lot area.

    aerial view of North Plains construction site

May 26, 2020

  • The structural steel is being painted and exterior panels are being installed on the new gym.

    painting structural steel

    interior gym structure facing east

    exterior gym structure facing west

May 18, 2020

  • Photos 1 and 2: Framing of the gym continues as crews work on the perimeter of the structure: (1) northwest corner and (2) east side.

    northwest corner of gym

    east side of gym

    Photo 3: trenching is being done for utility lines along the north edge of the future parking lot.

    utility trenching on north side

May 11, 2020

  • Crew members continue framing the gym structure. Painting of the beams will follow shortly.

    main framing of the gym

    crew member works on the top beams

    framing at the sides of the structure

  • Photos 1-2: steel framing is being erected for the new gymnasium.

    aerial view of steel framing

    steel framing being erected

April 27, 2020

  • Photos 1-2: the wood frames that were used to pour the concrete for the foundation are being dismantled.

    dismantling wood frames for foundation concrete

    aerial view of frame dismantling

    Photo 3: an aerial view of the site work to date.

    aerial view of site on April 27

April 22-23, 2020

  • Before: this aerial view shows the rebar grid for the concrete foundation.

    aerial view of rebar grid for foundation

    After: concrete has been poured.

    aerial view of completed concrete pour for foundation

    Crew members smooth out the concrete foundation.

    crew members smooth out concrete

April 13, 2020

  • These aerial views of the construction site show the framing for the foundation is nearly ready for an upcoming concrete pour.

    aerial view of framing for gym foundation

    aerial view of construction area

April 6, 2020

  • Photo 1: trenching for utility lines are marked inside the foundation area.

    trenching inside foundation area

    Photo 2: a long aerial view of the construction site.

    aerial view of construction site

March 30, 2020

  • Base rock has been laid on the gym site. Crew members are starting the framing for the concrete foundation and have already cleared trees on the northwest side of the campus to prepare for construction of the new dropoff area.

    Photo 1: aerial view facing east.

    crew members framing for gym foundation

    Photo 2: aerial view facing west.

    aerial view of construction area

March 23, 2020

  • Photo 1: laying of base rock has started on the gym site.

    aerial view of gym site construction

March 18, 2020

  • Photos 1 and 2: grading of the area prior to installation of base rock for the gym foundation.

    grading of gym foundation area

    smoothing of graded soil

     

March 10, 2020

  • Photo 1: Excavation has begun for the new gymnasium.

    aerial view of excavation for gym

    Photo 2: this aerial view shows the full construction area for the new dropoff (to the north side/left of campus) and the gymnasium (adjacent to existing building).

    aerial view of North Plains campus

     

Milestones

  • March 2020 - work begins on excavation for new gym

    Comments (-1)