Sept. 8, 2021

  • Photos 1-2: the new playground is finished and ready for students on the first day of school.

    aerial view of new playground (southeast view)

    aerial view of new playground (northwest view)

    Comments (-1)

Aug. 24, 2021

  • Photos 1-2: crew members install the new playground equipment and the rubberized tiles that provide a cushioned surface.

    playground equipment installation

    installation of play dome

Aug. 18, 2021

  • Photos 1-2: the concrete has been poured for the playground base, with holes created for placing the equipment posts.

    aerial view of playground site base

    holes in concrete for equipment posts

Aug. 11, 2021

  • Photos 1-3: curbs have been poured around the playground perimeter and the base gravel compacted. The round forms will create holes in an upcoming concrete pour to guide placement of the playground equipment and swingset.

    playground area curbwork and forms

    forms for the playground equipment posts

    forms for the swingset posts

Aug. 3, 2021

  • Photos 1 and 2: forms for the concrete curbs outline the playground area.

    aerial view of forms for concrete curbs

    ground view of forms for concrete curbs

July 28, 2021

  • Photos 1 and 2: crew member start framing the playground curb for an upcoming concrete pour.

    setting up framing for concrete curbs

    constructing framing for concrete curbs

    Photo 3: security hardware has been installed at the main entry to the school to monitor and secure access into the building.

    entry security hardware

July 23, 2021

  • Photos 1 and 2: excavation and grading of the new playground has started.

    aerial view of playground site excavation

    crew member verifies depth of excavation

    Photo 3: re-roofing of the covered play area canopy is complete.

    roofing done over covered play structure