Photos 1-2: crew members install the new playground equipment and the rubberized tiles that provide a cushioned surface.
Aug. 18, 2021
Photos 1-2: the concrete has been poured for the playground base, with holes created for placing the equipment posts.
Aug. 11, 2021
Photos 1-3: curbs have been poured around the playground perimeter and the base gravel compacted. The round forms will create holes in an upcoming concrete pour to guide placement of the playground equipment and swingset.
Aug. 3, 2021
Photos 1 and 2: forms for the concrete curbs outline the playground area.
July 28, 2021
Photos 1 and 2: crew member start framing the playground curb for an upcoming concrete pour.
Photo 3: security hardware has been installed at the main entry to the school to monitor and secure access into the building.
July 23, 2021
Photos 1 and 2: excavation and grading of the new playground has started.
Photo 3: re-roofing of the covered play area canopy is complete.