May 2, 2022

  • Photo 1: crew members set the framing for the additional protective fencing at the bus driveway gate.

    installing fence frame

    Photos 2 and 3: installation of the fencing is complete.

    mounted rolling gate with additional fencing

    closer view of protective fencing for rolling gate

    Comments (-1)

March 16-21, 2022

  • Photo 1: a crew member installs and sets the gate's operating motor, which opens and closes the gate as needed.

    installing gate motor

    Photo 2: the gate itself has been mounted in its frame.

    mounted rolling gate

    Photos 3 and 4: views of the gate closed across the driveway for the bus dropoff.

    view of gate toward school

    view of gate toward street

March 8, 2022

  • Photo 1: the new driveway gate lies on its side, ready to be mounted on its frame.

    new driveway gate for bus dropoff entrance

    Photo 2: crew members adjust the frame for the gate. A motor will be attached to automatically open and close the gate on demand.

    adjusting mounting frame for driveway gate

Feb. 8, 2022

  • Photos 1 and 2: the Southview-side improvements for the bus dropoff entrance, including storm drainage and sidewalks, are complete.

    Southview driveway into bus dropoff

    bus dropoff entrance looking toward Southview

Jan. 25, 2022

  • Photos 1-3: new curb lines the driveway to the bus dropoff entrance as the first concrete pour took place last Friday. The second pour, for sidewalks, will take place this Friday.

    new curb lines driveway

    concrete curb installed along driveway

    view of driveway construction toward Southview

Jan. 18, 2022

  • Photos 1-3: crew members backfill and compact gravel over utility pipe installations.

    picking up gravel for backfilling

    compacting gravel over utility pipes

    utility pipe installation area

Jan. 12, 2022

  • Photos 1-3: pipe installation continues along the driveway for the bus loop as part of the improvements required by the county along Southview Street.

    pipe installation 1

    pipe installation 2

    covered up work area

Dec. 29, 2021

  • Photos 1-3: storm drain culverts and pipe are being installed as part of the Southview Street improvements. A crew member works on the electric connections for the large, rolling gate that will be added across the bus loop driveway.

    covered storm drain work area

    storm drain culverts line street

    storm drain culverts

Dec. 23, 2021

  • Photos 1-3: half-road improvements have started on Southview Street, on the Butternut Creek Elementary side, as required by county land use conditions for the bus loop and other renovations made last summer.

    Southview construction start 1

    Southview construction start 2

    Southview construction start 3