Aug. 24, 2022

  • Photos 1-3: finshing touches are being added to the windows, including caulking, cleanup and painting of the trim.

    caulking exterior of new windows

    cleaning up newly-installed windows

    painting trim of newly-installed windows

    Comments (-1)

Aug. 15, 2022

  • Photos 1-3: crew members have started installing new windows in the courtyard area.

    windows installed on north courtyard building wall

    crew members lift new window to its space

    position of new window inside classroom

    Photos 4 and 5: window installation at the front of the building is completed.

    new windows on westside offices

    new windows at front of school

    Photo 6: window installation is just beginning on the south side of the school.

    start of window installation on southside building

Aug. 8, 2022

  • Photos 1-3: new windows have arrived and are being installed first on the administration side of the building.

    windows installed on side of building

    crew members installing new windows

    window installation seen from inside

    Photos 4: a set of frames at the back of the building are being weatherproofed to prepare for installation of windows.

    preparing for window installation at back of building

July 25, 2022

  • Photos 1-2: old paint is removed from existing window framing to ensure there is no potential trace of lead resulting from removal of the old glazing.

    removing old paint from window frames

    crew members remove old paint from window frames

July 18, 2022

  • Photos 1-2: plywood covers trimmed window openings until new glazing is delivered and installed.

    plywood-covered windows at front of school

    plywood-covered windows in courtyard

    Photo 3: view inside a classroom of the windows to be constructed.

    classroom windows under construction

June 30, 2022

  • Video: a set of windows is tested for proper sealing and weatherproofing construction. If all tests are passed, then installation can take place for the remaining windows around the building.

    Photo: crew members prepare for window installation adjacent to the test area.

    setting up window installation

June 27, 2022

  • Photo 1: old windows are stacked to the side in the courtyard after removal. Plywood covers the empty spaces until they can be worked on and new, double-paned windows installed.

    removed windows are set aside in the courtyard

    Photo 2: new framing and waterproofing is added along one wall.

    re-framing and waterproofing of window section