Photos 1-2: paving has been completed on the south blacktop play area. Coming soon are striping and re-installation of the basketball hoops.
Aug. 4, 2022
Photos 1-2: making quick work on this project, the crew has started paving on the south blacktop play area. Striping and re-installation of the basketball hoops comes next.
Aug. 2, 2022
Photos 1-3: the failing blacktop play area adjacent to the south playground is being regraded and replaced.