    Bond construction timeline - Brookwood

     


Scope of Work

  • Please note that the preliminary site plan/design, project costs, and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Projected budget of $40.5 million includes planning/permitting, architectural design and construction costs.

    2019-2020

    • Replacement of School

    The new Brookwood Elementary School will replace the existing building by fall 2020. It will be an approximately 72,500 sq. ft., two-story building that can house up to 600 students. At nearly twice the size of the existing building, the new school will more readily accommodate the growing student enrollment in the community.

    The current design has "learning streets" centered between classrooms, with coordinated colors to distinguish grade level areas. The gym and cafeteria are separate spaces, but can be combined as needed for large events. A STEAM lab and outdoor learning area promote inquisitive research. Natural lighting is a feature of the design and orientation of the building, which is sited behind the existing building.

    In May 2019, development will begin on the site of the new building. Note that the existing kindergarten classrooms will need to be demolished by the end of the 2018-19 school year to form a safety corridor between construction and students. For the 2019-20 school year, the kindergartners will be accommodated within the main building and older children will be housed in the existing portables.

    The existing building will be demolished in summer 2020 so that the rest of the site (parent/bus dropoff areas, playing field) can be developed in time for the start of the school year.

     

Upcoming Events

  • Groundbreaking Ceremony - The community is invited to attend the groundbreaking ceremony on Monday, April 29, 2019, 2 p.m., to commemorate the start of construction of the replacement building. Construction is expected to begin on May 1.

    Comments (-1)
  • Farewell Ceremony (late May/early June 2020) - By the end of the 2019-20 school year, we will be inviting students, alumni, families and community members to say farewell to the existing Brookwood school. The date has not been set at this time.

    Comments (-1)

Project Staff

  • Project Manager

    Cornerstone Management Group

    • Emil Hameed

    Architect

    • DLR Group

    Contractor

    • General: LCG Pence Construction