Rendering of proposed gym at Eastwood
  • Bond construction timeline - Eastwood

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors.

    Spring-Summer 2019

    • Renovations, New Gym

    Eastwood will undergo a number of building enhancements to upgrade safety and renovate the school. These include security and seismic upgrades, roofing, and the addition of heating to the HVAC system. The existing portable buildings will be replaced with a permanent modular building with four classrooms. A new gymnasium will allow exclusive use for PE and activities, separate from the cafeteria. View the proposed site plan.

    Construction of the gym is anticipated to start in March 2019, followed by the remaining projects in June 2019. All projects are expected to be completed by the end of August 2019.

    Construction budget: $3.5 million

    • Playground, Flexible Furniture

    Students will be excited about their playground upgrades that promote healthy play and exercise, and the new flexible furniture (FFE) they will have in their classrooms that stimulates engagement and learning. These projects will take place in summer 2019.

    Completed Projects

    • Parent/Bus Dropoff

    The parking lots and parent/bus dropoffs were completely remodeled at Eastwood during the summer of 2018. The traffic pattern of the new dropoff areas now separates personal vehicles from the buses, not only enhancing pedestrian and driver safety, but allowing for a smoother flow of traffic during dropoff and pickup times. The project was completed in late August 2018.

  • Project Manager 

    Cornerstone Management Group

    • Parent/bus dropoff: Todd Johnson
    • Renovations: Luke Harkness

    Architect/Engineer

    • Parent/bus dropoff: 3J Consulting
    • Renovations: Mahlum Architects

    Contractor

    • Parent/bus dropoff: Kerr Contractors
    • Renovations, gym, portable classroom replacement: Five Star Builders

     

Last Modified on November 16, 2018