• Bond construction timeline for Farmington View

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Projected budget: $4.8 million

    Summer 2021 Projects

    Farmington View will be undergoing renovations in summer 2021 that include safety and seismic upgrades, equipment replacements and upgrades, and roofing. The parent/bus dropoff area will be remodeled to enhance the safety of both pedestrians and drivers as well as to promote more orderly flow of traffic.

    Completed Projects

    • New Playground

    Students were excited about their new playground upgrades that promote healthy play and exercise. The play structure, with ground-level ADA-accessible activities, was installed in summer 2018 on a safer, padded tile surface, and has an accompanying all-weather, synthetic turf play area.

    • Flexible Furniture

    New flexible furniture (FFE) was delivered to the school in summer 2018. Research has shown that this type of furniture helps stimulate student engagement and learning.

    • Modular Building

    The existing portables were replaced with a new permanent, modular building that includes two classrooms and restrooms. The modular building was installed in summer 2018.

  • Project Manager  

    Cornerstone Management Group

    • Modular building, playground: Rick Cunningham
    • FFE: Karyn Rainone

    Architect/Engineer

    • Modular building, playground: 3J Consulting, Inc.

    Contractor

    • Modular building: Five Star
    • Playground
      • Site work: Five Star Builders, Inc.
      • Structure: Cascade Recreation
      • Rubber tile: NW Playground Equipment
    • FFE
      • McDowell-Craig (desks)
      • School Specialty (seating)