• Bond construction timeline for Groner

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Projected budget: $3.4 million

    Summer 2021 Projects

    • Improvements, Playground

    Groner's building will undergo renovations including safety and seismic upgrades, roofing and domestic water pipe replacement. Students will be excited about their new playground, with ground-level, ADA-accessible activities and a safer, rubberized tile play surface. A synthetic turf play area will be installed next to the structure that students can use in all types of weather.

    Completed Project

    • Flexible Furniture

    Flexible furniture (FFE) was delivered in summer 2018. Research shows this type of furniture enhances the learning environment and increases student engagement.

  • Project Manager 

    Cornerstone Management Group

    •  FFE: Karyn Rainone

    Architect

     

    Contractor

    • FFE
      • McDowell-Craig (desks)
      • School Specialty (seating)