• Bond construction timeline - Jackson

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Projected budget: $7.6 million

    Summer 2021

    • Improvements

    To further enhance safety and security, the Jackson building will be renovated to install seismic improvements, DAS, security cameras, interior door locks, and alert/warning systems in summer 2021

    • New Gym

    A new gymnasium will be constructed to allow exclusive use for PE and activities, separate from the cafeteria. It will be built to "immediate occupancy" seismic standards, which will allow use as an emergency shelter by the community in case of a major earthquake.

    Completed Projects

    • Parent/Bus Dropoff

    Jackson's parking lots and parent/bus dropoffs were completely remodeled in summer 2019. The traffic pattern of the new dropoff areas separated personal vehicles from the buses, not only enhancing pedestrian and driver safety, but allowing for a smoother flow of traffic during dropoff and pickup times. This project was originally scheduled to be constructed in summer 2018; however, external delays required postponement to summer 2019.

    • Flexible Furniture

    In summer 2018, new flexible furniture (FFE) was delivered to Jackson classrooms. Research has shown that this type of furniture promotes engagement and learning.

  • Project Manager 

    Cornerstone Management Group

    • Parent/bus dropoff: Todd Johnson
    • FFE: Karyn Rainone

    Architect/Engineer

    • Parent/bus dropoff: 3J Consulting

    Contractor

    • Parent/bus dropoff: Kerr Contractors
    • FFE
      • McDowell-Craig (desks)
      • School Specialty (seating)