• Bond construction timeline - Jackson

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors.

    Summer 2019

    • Parent/Bus Dropoff

    After school is out in mid-June 2019, Jackson's parking lots and parent/bus dropoffs will be completely remodeled. The traffic pattern of the new dropoff areas will separate personal vehicles from the buses, not only enhancing pedestrian and driver safety, but allowing for a smoother flow of traffic during dropoff and pickup times. This project was originally scheduled to be constructed in summer 2018; however, external delays required postponement to summer 2019.

    Summer 2021

    • Improvements

    To further enhance safety and security, the Jackson building will be renovated to install seismic improvements, DAS, security cameras, interior door locks, and alert/warning systems in summer 2021

    • New Gym

    A new gymnasium will be constructed to allow exclusive use for PE and activities, separate from the cafeteria. It will be built to "immediate occupancy" seismic standards, which will allow use as an emergency shelter by the community in case of a major earthquake.

    Completed Project

    • Flexible Furniture

    In summer 2018, new flexible furniture (FFE) was delivered to Jackson classrooms. Research has shown that this type of furniture promotes engagement and learning.

  • Goal / Project

    Estimated Cost

    security camera Prioritize Safety and Security

    School safety upgrades

    • Interior door locks
    • Strobes, visual warning inside and outside
    • Security cameras
    • Improve line of sight from office to front door
    • Card key access - exterior doors
    • Alert button at front desk
    • Fire doors on alert button at front desk
    • Glass film at main door and on other windows
    • Upgrade in-building radio communication

    $283,942

      

    School seismic upgrades

    1,238,588

    Parent/bus dropoff improvements

    826,875

    building under construction Renovate and Repair Aging Schools

    Building renovation/enhancement

    • Construct new gymnasium - eliminate cafegymitoriums

     

    • 2,550,000

    computer monitor; technology  Provide a Modern Education for Every Student

    Educational Technology (classroom)

    • CRT monitor replacement
    • Classroom projectors
    • Voice amplification
    • Wireless access points
    • Whiteboards
    • Document cameras
    • Student computers
    • Licensed staff computers
    • Classified staff computers
    • Elementary gymnasium audio/visual system

    380,675

      

    Student Achievement

    • Flexible classroom furniture

     

    • 238,870

    Total Investment

    $5,563,950

     

  • Project Manager 

    Cornerstone Management Group

    • Parent/bus dropoff: Todd Johnson
    • FFE: Karyn Rainone

    Architect/Engineer

    • Parent/bus dropoff: 3J Consulting

    Contractor

    • Parent/bus dropoff: Kerr Contractors
    • FFE
      • McDowell-Craig (desks)
      • School Specialty (seating)