• Bond construction timeline - Minter Bridge

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors.

    Summer 2019

    • Flexible Furniture

    New flexible furniture (FFE) will be delivered to Minter Bridge classrooms in summer 2019. Research has shown that this type of furniture helps stimulate student engagement and learning.

    Summer 2020

    • Improvements

    In summer 2020, construction will begin on renovations to the existing building. These improvements include security cameras, interior door locks, alert/warning systems, and other safety measures. Seismic upgrades and new roofing will be added, as well as heating to the existing HVAC system.

    • New Modular Building

    The existing portables will be replaced with a new modular building (including restroom).

    • Parent/bus Dropoff Area Upgrades

    Improvements will be made to the parent and bus dropoff areas. The new design will separate buses from regular vehicular traffic to improve traffic flow, pedestrian and driver safety, and efficiency of dropoffs. 

    • New Gym

    A new gymnasium will be built on the campus, enabling dedicated use for PE and activities, separate from the cafeteria. The gym will be constructed to "immediate occupancy" seismic standards, providing an emergency shelter resource to the community in case of a major earthquake.

     

  • Goal / Project

    Estimated Cost

    security camera Prioritize Safety and Security

    School safety upgrades

    • Interior door locks
    • Strobes, visual warning inside and outside
    • Security cameras
    • Improve line of sight from office to front door
    • Card key access - exterior doors
    • Alert button at front desk
    • Fire doors on alert button at front desk
    • Glass film at main door and other windows
    • Upgrade in-building radio communications

    $234,933

    School seismic upgrades

    2,280,979

    Parent/bus dropoff improvements

    694,575

    building under construction Renovate and Repair Aging Schools

    Current Infrastructure Improvements

    • Roofing
    • Add heat to HVAC

     

    • 102,645
    • 65,207

    Building renovation/enhancement

    • Replace portable building(s) with permanent structure(s)
    • Construct new gymnasium - eliminate cafegymitoriums

     

    • 295,313
    • 2,550,000

    computer monitor; technology  Provide a Modern Education for Every Student

    Educational Technology (classroom)

    • CRT monitor replacement
    • Classroom projectors
    • Voice amplification
    • Wireless access points
    • Whiteboards
    • Document cameras
    • Student computers
    • Licensed staff computers
    • Classified staff computers
    • Elementary gymnasium audio/visual system

    348,420

      

    Student Achievement

    • Flexible classroom furniture

     

    • 241,180

    Total Investment

    $6,813,252