• Bond construction timeline for Reedville

     


Scope of Work

  • Completed Project

    Reedville got a makeover! While maintaining the historic charm of the exterior of the school, additions and upgrades to the interior provide the Reedville community a modernized facility to further enhance the positive learning environment.

    The existing building received: seismic and security upgrades; HVAC upgrades and air conditioning; roof replacement; new flooring; a bathroom addition at the lower level; and renovation of the old cafeteria space to a new media center and flexible classroom space. A new elevator between the lower and upper levels improves ADA accessibility.

    A new parent/bus dropoff area is expected to significantly mitigate traffic and safety concerns. Students love their new playground equipment on a safer rubber tile surface and their all-weather synthetic turf play area.

    New classroom technology and flexible furniture (FFE) bring modern tools for learning and achievement.

    The five old portables were replaced with a permanent, modular building containing five classrooms and a new cafeteria - students will be able to eat together instead of in four different shifts or in their classrooms.

    Reedville has become a revitalized, but still historic, site through the bond-funded renovations.

  • Goal / Project

    Estimated Cost

    security camera Prioritize Safety and Security

    School safety upgrades

    • Interior door locks
    • Strobes, visual warning inside and outside
    • Security cameras
    • Improve line of sight from office to front door
    • Card key access - exterior doors
    • Alert button at front desk
    • Glass film at main door
    • Upgrade in-building radio communication

    $305,421

     

    School seismic upgrades

    1,160,508

    Playground upgrades

    189,000

    building under construction Renovate and Repair Aging Schools

    Current infrastructure improvements

    • Roofing
    • Add air conditioning
    • Direct digital controls
    • Upgrade electrical service/generator
    • Construct new parking lot
    • Replace flooring


    316,589
    654,057
    182,413
    53,380
    1,300,000
    350,000

    Building renovation/enhancement

    • Replace portable buildings with permanent structures
    • New modular cafeteria with kitchen


    1,476,565
    1,500,000

    computer monitor; technology Provide a Modern Education for Every Student

    Educational technology

    • CRT monitor replacement
    • Classroom projectors
    • Voice amplification
    • Wireless access points
    • Whiteboards
    • Document cameras
    • Student computers
    • Licensed staff computers
    • Classified staff computers
    • Elementary gymnasium audio/visual system

    198,090

    Student achievement

    • Flexible classroom furniture

     

    • 122,064

    Total Investment

    $7,808,087

     

  • Project Manager

    Cornerstone Management Group

    • Building addition/improvements: John Abel
    • FFE: Karyn Rainone

    Architect

    Mahlum Architects

    Contractors

    • Building addition/improvements: Inline Construction
    • Hazardous materials abatement: Northstar
    • Movers: Lile Moving & Storage
    • Play equipment installation: Cascade Recreation
    • Play area rubber tile installation: NW Playground