• Bond construction timeline - WL Henry

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors.

    Summer 2019

    • Flexible Furniture

    New flexible furniture (FFE) will be delivered to W.L. Henry classrooms in summer 2019. Research has shown the furniture to promote engagement and learning.

    Summer 2020

    • Improvements

    Major construction projects will include seismic upgrades to the existing building, and safety measures such as security cameras, interior door locks, and alert/warning systems. New roofing and enhancements/replacements to building equipment will also help improve the learning environment.

    • Parent/Bus Dropoff Areas

    The parent/bus dropoff areas will be modified to separate personal vehicles from buses, not only enhancing pedestrian and driver safety, but allowing for a smoother flow of traffic during dropoff and pickup times. 

    • New Gym

    An exciting addition is a new gymnasium that enables dedicated use for PE and activities, separate from the cafeteria, and which can serve as an emergency shelter for the community in case of a major earthquake.

    Completed Projects

    • Playground

    W.L. Henry's playground was installed on a safer, rubberized tile surface in summer 2018, and students can now play rain or shine on a new, synthetic turf area.

    • Modular Building

    Due to permitting delays, W.L. Henry's new modular building, originally scheduled for summer 2018, was installed in November 2018. The permanent building houses three classrooms and includes a bathroom facility, replacing the existing temporary, two-classroom, no bathroom portable.

  • Goal / Project

    Estimated Cost

    security camera Prioritize Safety and Security

    School safety upgrades

    • Interior door locks
    • Strobes, visual warning inside and outside
    • Security cameras
    • Improve line of sight from office to front door
    • Card key access - exterior doors
    • Alert button at front desk
    • Glass film at main door
    • Upgrade in-building radio communications

    $419,897

    School seismic upgrades

    609,594

    Parent/bus dropoff improvements

    1,158,204

    Playground upgrades

    189,000

    building under construction Renovate and Repair Aging Schools

    Current Infrastructure Improvements

    • Roofing
    • Add air conditioning
    • Water pipe replacement
    • Boiler replacement
    • Direct digital controls (DDC)
    • Upgrade electrical service/generator

     

    • 87,234
    • 919,953
    • 618,790
    • 371,987
    • 667,523
    • 52,708

    Building Renovation/Enhancement

    • Replace portable building(s) with permanent structure(s)
    • Construct new gymnasium - eliminate cafegymitoriums

     

    • 590,626
    • 2,550,000

    computer monitor; technology  Provide a Modern Education for Every Student

    Educational Technology (classroom)

    • CRT monitor replacement
    • Classroom projectors
    • Voice amplification
    • Wireless access points
    • Whiteboards
    • Document cameras
    • Student computers
    • Licensed staff computers
    • Classified staff computers
    • Elementary gymnasium audio/visual system

    338,638

      

    Student Achievement

    • Flexible classroom furniture

     

    • 173,971

    Total Investment

    $8,748,125

  • Project Manager

    Cornerstone Management Group

    • Modular building, playground: Rick Cunningham

    Architect/Engineer

    • Modular building, playground: 3J Consulting, Inc.

    Contractors

    • Modular building: Five Star Builders
    • Playground
      • Site work: Five Star Builders, Inc.
      • Structure: Cascade Recreation
      • Rubber tile: NW Playground Equipment