• construction timeline for West Union

     


Scope of Work

  • Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Projected budget: $5.7 million

    SUMMER 2021

    • MDF (Network) Room

    The main distribution frame room housing the school's network equipment will be renovated to provide better housing for this essential equipment.

    COMPLETED

    • Improvements

    In summer 2019, seismic, roofing, ADA compliance, and safety and security upgrades were implemented at West Union. Air conditioning was added to the HVAC system, and classrooms received flexible furniture (FFE).

    • Playground

    West Union's first bond project was a new playground that was installed in summer 2018. The play structure includes eight swings, with ADA accessibility for ground-level activities, and was installed on a safer, padded tile surface (replacing the existing wood chips). Students also have a 1500 square-foot artificial turf playspace that can be used rain or shine.

Contractors

  • Project Manager

    Cornerstone Management Group

    • Playground: Luke Harkness
    • Renovations: Becca VandeWalle

    Architect/Engineer

    • Renovations: Mahlum Architects
    • Playground: 3J Consulting

    Contractor

    • Playground:
      • Site work: Five Star Builders, Inc.
      • Structure: Cascade Recreation
      • Rubber tile: NW Playground Equipment