2019 Summer Work
Sept. 25, 2019
Roofing work is wrapping up. HVAC units have been installed on the roof.
Roofing work is wrapping up. HVAC units have been installed on the roof.
Roofing work is nearly complete (west/left side of building).
The first day of school shows the finished pipes and conduits amid freshly-painted hallways. Inspirational phrases have been repainted on the ceiling beams and color stripes designate hallway locations to facilitate emergency response.
Photo 1: HVAC ductwork is being installed in the gym to add air conditioning.
Photo 2: insulation is being wrapped around hot water pipes.
Photo 3: domestic water pipe is being replaced in the bathrooms.
Photo 4: the woodshop area is undergoing seismic and roofing upgrades.
Photos 1-3: Crews work on renovating the roof.
Photos 4-6: inside the school, work continues with HVAC and domestic water pipe upgrades.
Photo 1: Roofing preparations.
Photos 2 and 3: Old HVAC ducts wait to be recycled, while new ducts are going to be installed.
Photo 4: HVAC ductwork in the gym has been marked for replacement
Photo 5: A crew member is installing a large HVAC duct.
Photo 6: Ductwork in progress.