2019 Summer Work

Sept. 25, 2019

Roofing work is wrapping up. HVAC units have been installed on the roof.

roofing work at Brown MS

Roofing work is wrapping up. HVAC units have been installed on the roof.

roofing work at Brown MS

Roofing work is nearly complete (west/left side of building).

aerial view of Brown campus

The first day of school shows the finished pipes and conduits amid freshly-painted hallways. Inspirational phrases have been repainted on the ceiling beams and color stripes designate hallway locations to facilitate emergency response.

Phrases on ceiling beams

purple hall

green hall

orange hall

Photo 1: HVAC ductwork is being installed in the gym to add air conditioning.

gym ductwork installation

Photo 2: insulation is being wrapped around hot water pipes.

insulation over water pipe

Photo 3: domestic water pipe is being replaced in the bathrooms.

domestic water pipe replacement in bathroom

Photo 4: the woodshop area is undergoing seismic and roofing upgrades.

woodshop area renovations

Photos 1-3: Crews work on renovating the roof.

Workers on rooftop

Workers on rooftop

Worker on rooftop

Photos 4-6: inside the school, work continues with HVAC and domestic water pipe upgrades.

HVAC duct in wall

Pipes in ceiling

Marked pipes in walls

Photo 1: Roofing preparations.

Roofing preparations

Photos 2 and 3: Old HVAC ducts wait to be recycled, while new ducts are going to be installed.

Old HVAC ducts to be recycled

New HVAC ducts to be installed

Photo 4: HVAC ductwork in the gym has been marked for replacement

HVAC equipment in gym marked for replacement

Photo 5: A crew member is installing a large HVAC duct.

Crew member installing large HVAC pipe

Photo 6: Ductwork in progress.

Ductwork in progress

Milestones

Aug. 30, 2019 - first summer of work completed.

June 17, 2019 - work begins on the summer 2019 phase of renovations.