2021-22 Southview Improvements

May 2, 2022

Photo 1: crew members set the framing for the additional protective fencing at the bus driveway gate.

installing fence frame

Photos 2 and 3: installation of the fencing is complete.

mounted rolling gate with additional fencing

closer view of protective fencing for rolling gate

Photo 1: a crew member installs and sets the gate's operating motor, which opens and closes the gate as needed.

installing gate motor

Photo 2: the gate itself has been mounted in its frame.

mounted rolling gate

Photos 3 and 4: views of the gate closed across the driveway for the bus dropoff.

view of gate toward school

view of gate toward street

Photo 1: the new driveway gate lies on its side, ready to be mounted on its frame.

new driveway gate for bus dropoff entrance

Photo 2: crew members adjust the frame for the gate. A motor will be attached to automatically open and close the gate on demand.

adjusting mounting frame for driveway gate

Photos 1 and 2: the Southview-side improvements for the bus dropoff entrance, including storm drainage and sidewalks, are complete.

Southview driveway into bus dropoff

bus dropoff entrance looking toward Southview

Photos 1-3: new curb lines the driveway to the bus dropoff entrance as the first concrete pour took place last Friday. The second pour, for sidewalks, will take place this Friday.

new curb lines driveway

concrete curb installed along driveway

view of driveway construction toward Southview

Photos 1-3: crew members backfill and compact gravel over utility pipe installations.

picking up gravel for backfilling

compacting gravel over utility pipes

utility pipe installation area

Photos 1-3: pipe installation continues along the driveway for the bus loop as part of the improvements required by the county along Southview Street.

pipe installation 1

pipe installation 2

covered up work area

Photos 1-3: storm drain culverts and pipe are being installed as part of the Southview Street improvements. A crew member works on the electric connections for the large, rolling gate that will be added across the bus loop driveway.

covered storm drain work area

storm drain culverts line street

storm drain culverts

Photos 1-3: half-road improvements have started on Southview Street, on the Butternut Creek Elementary side, as required by county land use conditions for the bus loop and other renovations made last summer.

Southview construction start 1

Southview construction start 2

Southview construction start 3

Photo 1: a crew member installs and sets the gate's operating motor, which opens and closes the gate as needed.

installing gate motor

Photo 2: the gate itself has been mounted in its frame.

mounted rolling gate

Photos 3 and 4: views of the gate closed across the driveway for the bus dropoff.

view of gate toward school

view of gate toward street

Photo 1: the new driveway gate lies on its side, ready to be mounted on its frame.

new driveway gate for bus dropoff entrance

Photo 2: crew members adjust the frame for the gate. A motor will be attached to automatically open and close the gate on demand.

adjusting mounting frame for driveway gate

Photos 1 and 2: the Southview-side improvements for the bus dropoff entrance, including storm drainage and sidewalks, are complete.

Southview driveway into bus dropoff

bus dropoff entrance looking toward Southview

Photos 1-3: new curb lines the driveway to the bus dropoff entrance as the first concrete pour took place last Friday. The second pour, for sidewalks, will take place this Friday.

new curb lines driveway

concrete curb installed along driveway

view of driveway construction toward Southview

Photos 1-3: crew members backfill and compact gravel over utility pipe installations.

picking up gravel for backfilling

compacting gravel over utility pipes

utility pipe installation area

Photos 1-3: pipe installation continues along the driveway for the bus loop as part of the improvements required by the county along Southview Street.

pipe installation 1

pipe installation 2

covered up work area

Photos 1-3: storm drain culverts and pipe are being installed as part of the Southview Street improvements. A crew member works on the electric connections for the large, rolling gate that will be added across the bus loop driveway.

covered storm drain work area

storm drain culverts line street

storm drain culverts

Photos 1-3: half-road improvements have started on Southview Street, on the Butternut Creek Elementary side, as required by county land use conditions for the bus loop and other renovations made last summer.

Southview construction start 1

Southview construction start 2

Southview construction start 3