2021-22 Southview Improvements
May 2, 2022
Photo 1: crew members set the framing for the additional protective fencing at the bus driveway gate.
Photos 2 and 3: installation of the fencing is complete.
Photo 1: a crew member installs and sets the gate's operating motor, which opens and closes the gate as needed.
Photo 2: the gate itself has been mounted in its frame.
Photos 3 and 4: views of the gate closed across the driveway for the bus dropoff.
Photo 1: the new driveway gate lies on its side, ready to be mounted on its frame.
Photo 2: crew members adjust the frame for the gate. A motor will be attached to automatically open and close the gate on demand.
Photos 1 and 2: the Southview-side improvements for the bus dropoff entrance, including storm drainage and sidewalks, are complete.
Photos 1-3: new curb lines the driveway to the bus dropoff entrance as the first concrete pour took place last Friday. The second pour, for sidewalks, will take place this Friday.
Photos 1-3: crew members backfill and compact gravel over utility pipe installations.
Photos 1-3: pipe installation continues along the driveway for the bus loop as part of the improvements required by the county along Southview Street.
Photos 1-3: storm drain culverts and pipe are being installed as part of the Southview Street improvements. A crew member works on the electric connections for the large, rolling gate that will be added across the bus loop driveway.
Photos 1-3: half-road improvements have started on Southview Street, on the Butternut Creek Elementary side, as required by county land use conditions for the bus loop and other renovations made last summer.
Photo 1: a crew member installs and sets the gate's operating motor, which opens and closes the gate as needed.
Photo 2: the gate itself has been mounted in its frame.
Photos 3 and 4: views of the gate closed across the driveway for the bus dropoff.
Photo 1: the new driveway gate lies on its side, ready to be mounted on its frame.
Photo 2: crew members adjust the frame for the gate. A motor will be attached to automatically open and close the gate on demand.
Photos 1 and 2: the Southview-side improvements for the bus dropoff entrance, including storm drainage and sidewalks, are complete.
Photos 1-3: new curb lines the driveway to the bus dropoff entrance as the first concrete pour took place last Friday. The second pour, for sidewalks, will take place this Friday.
Photos 1-3: crew members backfill and compact gravel over utility pipe installations.
Photos 1-3: pipe installation continues along the driveway for the bus loop as part of the improvements required by the county along Southview Street.
Photos 1-3: storm drain culverts and pipe are being installed as part of the Southview Street improvements. A crew member works on the electric connections for the large, rolling gate that will be added across the bus loop driveway.
Photos 1-3: half-road improvements have started on Southview Street, on the Butternut Creek Elementary side, as required by county land use conditions for the bus loop and other renovations made last summer.