2019-2020 - Renovations & Roofing
May 13, 2020
A crew works on the roofing over the building's administrative offices.
Crew members work on the roof improvements over each of the building wings. Supplies are lifted up to the rooftops via crane.
Renovations at Century are now in use as the school year has started.
A drop-down cage has been added to the student store to secure the inside during off-hours.
Updated power and cable management line the ceilings of the engineering classroom.
The culinary arts classroom, although waiting for complete closeout at this time, has new hoods and ranges in a kitchen now up to industry standards.
Photo 1: electric upgrades and overhead cable management installation are nearly complete.
Photo 2: ranges and hoods have been installed in the culinary classrooms.
Photo 3: cabinetry, finishes and paint refresh the renovated student store.
Work continues to complete the career-technical spaces.
Photos 1-3: in the culinary spaces, ventilation and power have been upgraded, and appliances are in the hallway ready to be installed.
Photo 4: graphic design classroom renovation is wrapping up, with transparency windows and overhead power/cable management installed.
Photos 5-6: the student store renovation is nearly done, and cabinetry will be installed shortly.
In career-technical classrooms, such as these on the north wing of the school, work is being done to add transparency, power/cable management, and collaborative walls, among other improvements.
Announcements
June 17, 2019 - work begins on renovations.