2019 - Modular Building
Montage
Sept. 19, 2019
The modular building is fully occupied with the Little Jags preschool (photo 1) and the high school early childhood education classroom (photo 2).
Photo 1: furniture and supplies have been moved into the preschool classroom.
Photos 2 and 3: the kitchen and high school student classroom are ready for move-in.
The modular building for the early childhood education program is nearly complete, with the punch list expected to be itemized next week.
Photos 1-3: inside the building, the rooms are being prepared for the installation of flooring and coving.
Photos 4-5: the exterior of the building has been painted, a walkway to the entrance has been installed, and a crew member cleans up the area.
All five pieces have been assembled and the rooftop was placed above. Crews will continue working on interior finishing and the roofing.
The first of five pieces of the new modular building has been placed.
The site stands ready for the next piece.
The second piece of the new modular building is placed.
The foundation is ready for the modular building.
Forms are being constructed for the modular building's foundation. They will be filled with concrete and the building will be placed and assembled above the foundation.
Pipe is being laid underground to prepare for the new modular building that will house the early childhood education program.