2021 - EIFS
Sept. 10, 2021
Photos 1-3: scaffolding has been removed from the areas of work around the auxiliary gym for the EIFS replacement. Coming soon is the final coating to seal the EIFS.
Photos 1 and 2: the skin coating is being applied on the new EIFS; when this is completed, scaffolding will start to be taken down.
Photo 1: scaffolding encircles the sections of the building near the auxiliary gym that are undergoing the phase 2 EIFS installation.
Photos 1 and 2: EIFS work continues on the north side of the school adjacent to the auxiliary gym.
Photo 3: final painting completes the EIFS work on the theatre section of the building
Photo 1: the EIFS replacement on the exterior of the theatre area is complete.
Photos 2-4: work progresses on replacing the EIFS on other sections of the school building.
Photos 1 and 2: scaffolding boards are being removed from the top of the completed theater wing and lowered by a large forklift.
Photo 3: work continues in the auxiliary theatre wing.
Photo 1: on the theater wing, the styrofoam insulation layer has been installed and crew members are now applying a concrete slurry mix to the exterior walls.
Photo 2: at the back of the auxiliary gym, base coating has been applied to most of the exterior walls.
Photo 1: scaffolding surrounds the auxiliary gym area at the back of the school where the old EIFS has been removed and the base coating applied to most of the area.
Photos 2 and 3: the base coating has been applied around the theatre wing and EIFS membrane panels are ready to be installed.
Photo 1: a base coat (blue) for the new EIFS siding has been added to the southeast corner of the building (auditorium area).
Photo 2: at the very top of the building, a crew member applies a weatherproofing coat (black) at the edge of the roof and side walls to prevent water intrusion. Weatherproofing will be applied at all seams of the building.
Photos 3 and 4: on the northeast corner of the building (auxiliary gym area), stripping of the old EIFS is well underway.
Photos 1-3: up on the scaffolding, crew members burn off the remaining styrofoam, while below, others mix the "mud" that will be placed over the exposed walls.
Photo 4: scaffolding and netting have been installed in the second work area.
Photo 1: a crew member builds up the scaffolding near the HVAC mechanical units at the back of the school to prepare this area for EIFS removal.
Photo 2: in the first area (theater), nearly all of the EIFS styrofoam layer has been removed.
Photo 1: scaffolding and netting now wrap the full corner of the auditorium building for EIFS replacement. The netting keeps the removed EIFS close to the building.
Photo 2: crew members work along the scaffolding to remove the EIFS.
Photo 3: removing the EIFS requires scraping off the top hard coating, then the styrofoam underneath.
Photo 4: the remaining glue along the side of the building will need to be scraped off before adding the replacement EIFS.
Scaffolding surrounds the corner of the building where the first section of the EIFS siding will be replaced.