Project Scope

aerial of Farmington View campus

construction timeline for Farmington View

 


Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Project costs: $6.6 million

COMPLETED

  • Building Renovations, Dropoff

Farmington View underwent extensive renovations in summer 2021 that included:

    • safety and seismic upgrades
    • window replacements (to double-pane)
    • HVAC equipment upgrades, including addition of air conditioning
    • ADA upgrades
    • roofing
    • parent/bus dropoff area improvements

The entry vestibule also was renovated to improve monitoring and limit entry into the school building.

  • New Playground

Students were excited about their new playground upgrades that promote healthy play and exercise. The play structure, with ground-level ADA-accessible activities, was installed in summer 2018 on a safer, padded tile surface, and has an accompanying all-weather, synthetic turf play area.

  • Flexible Furniture

New flexible furniture (FFE) was delivered to the school in summer 2018. Research has shown that this type of furniture helps stimulate student engagement and learning.

  • Modular Building

The existing portables were replaced with a new permanent, modular building that includes two classrooms and restrooms. The modular building was installed in summer 2018.

Project Manager

Cornerstone Management Group

  • John Abel

Architect/Engineer

  • Building, dropoff improvements: Mahlum Architects / AKS Engineering
  • Entry vestibule: Axis Architects

General Contractor

  • Building, dropoff improvements: Emerick Construction (CM/GC)
  • Entry vestibule: tbd

construction timeline for Farmington View

 


Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Project costs: $6.6 million

COMPLETED

  • Building Renovations, Dropoff

Farmington View underwent extensive renovations in summer 2021 that included:

    • safety and seismic upgrades
    • window replacements (to double-pane)
    • HVAC equipment upgrades, including addition of air conditioning
    • ADA upgrades
    • roofing
    • parent/bus dropoff area improvements

The entry vestibule also was renovated to improve monitoring and limit entry into the school building.

  • New Playground

Students were excited about their new playground upgrades that promote healthy play and exercise. The play structure, with ground-level ADA-accessible activities, was installed in summer 2018 on a safer, padded tile surface, and has an accompanying all-weather, synthetic turf play area.

  • Flexible Furniture

New flexible furniture (FFE) was delivered to the school in summer 2018. Research has shown that this type of furniture helps stimulate student engagement and learning.

  • Modular Building

The existing portables were replaced with a new permanent, modular building that includes two classrooms and restrooms. The modular building was installed in summer 2018.

Project Manager

Cornerstone Management Group

  • John Abel

Architect/Engineer

  • Building, dropoff improvements: Mahlum Architects / AKS Engineering
  • Entry vestibule: Axis Architects

General Contractor

  • Building, dropoff improvements: Emerick Construction (CM/GC)
  • Entry vestibule: tbd