2022 Windows
Aug. 29, 2022
Photos 1 and 2: window installation in the classroom wings is complete, with just finishing touches remaining, in time for the start of school. Blinds will be installed shortly.
Photo 3: a crew member applies the final caulking on the new windows.
Photo 1: windows at the front of the school and the office area are completely installed.
Photo 2: looking outside from the staff workroom.
Photo 3: a crew member adds weatherstripping around the windows to seal them.
Photo 4: windows awaiting weatherstripping and other finishing touches.
Photo 1: Groner's shipment of windows has arrived, and a set is already installed in the office area.
Photo 2: a window is carefully forklifted off a cart for installation at the front of the school.
Photo 3: crew members gently guide and carry the window to be placed inside its frame in a classoom section.
Photo 4: installation of the window as viewed from inside the classroom.
Photo 1: weatherproofing and trim work has started at the front of the building to prepare for the window glazing when delivered.
Photo 1: old windows have been removed from the front building and plywood temporarily installed for security.
Photo 2: plywood also covers the openings in the back of the building.
Photo 3: two new windows have been installed for testing to ensure that the methods for installing seals and weatherproofing have been applied correctly. Once passed, the remaining windows can be installed.
Photo 4: crew members add trim over seals and weatherproofing to prepare for installation of new windows.
Photo 1: crew members remove the old windows from the office area.
Photo 2: old windows also have been removed from the courtyard area of the main building.
Photo 3: weatherproofing layers are added to the sides of the window openings.
Photo 4: trim is added over the weatherproofing.