Project Scope

construction timeline for Hare Field


Please note that project costs and schedules may fluctuate due to cost of materials and labor, conditions at the site, unforeseen and/or revised scope, and other factors. Total costs: $409,844.

COMPLETED

  • Domestic Water Pipe Replacement

In summer 2022, aging water pipes in the locker room and concession areas under the bleachers were replaced. New water heaters and shower fixtures were also installed to complete the project.

  • Gate Replacement

Gates were replaced in fall 2021 for better and more secure operation.

Project Manager

Cornerstone Management Group

  • John Abel / Luke Harkness

Architect / Engineer

  • Corbin Spec.

Design-Build Contractor

  • Apollo Plumbing, Heating and Air Conditioning