2021 - Concrete Repairs
Sept. 8, 2021
Photos 1-3: concrete replacement is complete at the fronts of the gym and main office.
Photos 1-2: concrete is poured and smoothed for the landing area in front of the main office.
Photo 3: concrete work is nearly finished at the front of the main office.
Photo 4: work is finished in front of the gym. New bike racks have been added for student and staff use.
Photos 1-3: the stair sections have been joined in front of the gym and the main office. Framing for new curb has started and the gravel in between is being compacted for construction of additional walkways.
Photos 1 and 2: the concrete stairs have been poured in front of the gym and the main office.
Photo 3: this aerial views shows the extent of the concrete replacement work so far.
Photo 4: the concrete sides for the ADA access ramp have been poured in preparation for the base pour.
Photos 1-4: framing for concrete stairs and ADA access ramp are in place for an upcoming concrete pour.
Photos 1 and 2: in phase 1 of the concrete repair project, all the old concrete has been removed from the front of the gym. The ground has been excavated, and new base rock is being applied.
Photo 3: an additional project this summer has been the installation of a new monument sign with electronic screen at the front of the school.
Photos 1 and 2: fencing has been erected to close off the front of the main gym in preparation for upcoming concrete repairs.