2022 - Playground Asphalt

Sept. 20, 2022

Photos 1-3: the play area has been striped and the new basketball hoops are up, completing this project.

overhead aerial view of striped blacktop

angled aerial view of blacktop and basketball hoops

ground-level view of refreshed blacktop play area

Photos 1-2: paving has been completed on the south blacktop play area. Coming soon are striping and re-installation of the basketball hoops.

aerial photo of playground and blacktop

paved blacktop play area

Photos 1-2: making quick work on this project, the crew has started paving on the south blacktop play area. Striping and re-installation of the basketball hoops comes next.

paving of blacktop play area

using roller to smooth out asphalt

Photos 1-3: the failing blacktop play area adjacent to the south playground is being regraded and replaced.

aerial view of blacktop replacement

grading of play area