2019-20 Building Renovations
Sept. 21, 2020
The small roofing project has been completed.
Roofing work continues over the small area of the building.
A small re-roofing project has begun above the center of the building.
The new entryway has been installed at the front of the school. After the school day begins, all doors are locked, and visitors and late students will need to check in with the office. ID will be required for viewing and verification through the "doorbell" before the receptionist will buzz you in.
Photo 1: the new entryway welcomes visitors to check in.
Photo 2: on the other side of the door is the reception area and main office.
Photos 1 and 2: work continues on installing the new secured entry at the front of the school.
Photos 3-5: the early childhood education space received a new viewing window, a covered observation patio and fencing to enclose the play area.
Photos 6-7: culinary arts classrooms received upgrades to bring them up to industry standards.
Photo 1: the new entryway is framed.
Photo 2: the culinary arts preparation area is being renovated with new hoods, finishes and upgraded power to bring it up to industry standards
Photo 3: renovations to the early childhood education spaces will add security fencing and observation areas
Photo 1: the new chiller has been installed and is expected to start up on July 22, with commissioning (testing/evaluation) the following week.
Photo 2: wiring for the security system has been threaded through the conduits over the doors.
Photo 1: Work begins on creating a new entryway.
Photo 2: Entry security measures are being installed at all entrances/exits, including the ones leading out to the student parking lot.
Photo 1: Part of the main office is being demolished to prepare for a new, secured entrance.
Photo 2: Wiring is being installed throughout the building as part of security upgrades.