Project Updates
Nov. 4, 2022
Photo 1: installation of the inner doors of the entry vestibule is now complete. Access security is in place, requiring electronic badge access to enter the rest of the building. Visitors are required to check in at the main office.
Photo 2: students access the stairway to the second floor, beyond the secure entry vestibule.
Photo 3: this view of the entry vestibule toward the main entrance shows how the arch feature has been repeated on the new inner doorway.
Photo 1: the interior vestibule doorway has been installed and awaits final wiring and other finishing touches.
Photo 2: the arched storefront at the top of the doorway showcases the tiled artwork for the school name.
Photo 1: the new storefront for the interior vestibule doorway is expected to arrive later this month. In the meantime, a temporary barrier prevents visitor entry beyond the main office, where they are required to check in.
Photo 2: beyond the barrier is a temporary wall isolating the construction area from the rest of the school.
Photo 3: the temporary wall also protects the adjacent, actively-used stairwell.
Photos 1 and 2: construction plastic has been removed, opening up the vestibule and main office areas. The school is awaiting delivery and installation of storefront and doors to complete the vestibule. In the meantime, students will continue to be able to enter/exit via the dropoff doors during arrival and dismissal times.
Photos 3 and 4: the main office is open for business! Staff has been moved in and now occupy the remodeled office area.
Photo 1: doors have been installed for the main office entrances.
Photos 2 and 3: blinds have been installed on the office windows, and crew members finish assembly of the office furnishings.
Photos 1-2: with painting completed, next steps are to install the new vestibule doors and finish the office reconfiguration.
Photos 1-2: a crew member adds masking tape on the vestibule walls to prepare for painting the window trim.
Photo 3: conduit for security wiring hangs from the vestibule arch; connections will be made after the doors are installed.
Photo 4: the new tile artwork for the school name is now fully exposed after tape temporarily securing it has been removed.
Photos 1-2: new tile artwork spelling out the school name has been installed above the vestibule; tape holds it in place while the adhesive cures. A crew member smooths out drywall tape on the walls in advance of painting.
Photo 3: view of the vestibule toward the new office framing.
Photo 4: looking down on the vestibule from the stairwell.
Photo 5: looking out at the vestibule from the office area.
Photos 1-3: the new, arched vestibule doorway has been sheetrocked and ready for finishing and addition of door frames.
Photos 1-3: the entry arch has been repeated in the new vestibule framing.
Photos 1 and 2: framing for the vestibule has been constructed.
Photo 3: part of the stairwell will be walled off to enclose the secured vestibule.
Photos 1-3: crew members finish construction of the new framing for the main office.
Photo 1: the front entrance is closed for the vestibule renovations.
Photos 2-3: the main office doorways have been removed as renovations begin.
Photo 4: new door and sidelight framing is set along the wall in preparation for installation.
Photo 1: the interior vestibule doorway has been installed and awaits final wiring and other finishing touches.
Photo 2: the arched storefront at the top of the doorway showcases the tiled artwork for the school name.
Photo 1: the new storefront for the interior vestibule doorway is expected to arrive later this month. In the meantime, a temporary barrier prevents visitor entry beyond the main office, where they are required to check in.
Photo 2: beyond the barrier is a temporary wall isolating the construction area from the rest of the school.
Photo 3: the temporary wall also protects the adjacent, actively-used stairwell.
Photos 1 and 2: construction plastic has been removed, opening up the vestibule and main office areas. The school is awaiting delivery and installation of storefront and doors to complete the vestibule. In the meantime, students will continue to be able to enter/exit via the dropoff doors during arrival and dismissal times.
Photos 3 and 4: the main office is open for business! Staff has been moved in and now occupy the remodeled office area.
Photo 1: doors have been installed for the main office entrances.
Photos 2 and 3: blinds have been installed on the office windows, and crew members finish assembly of the office furnishings.
Photos 1-2: with painting completed, next steps are to install the new vestibule doors and finish the office reconfiguration.
Photos 1-2: a crew member adds masking tape on the vestibule walls to prepare for painting the window trim.
Photo 3: conduit for security wiring hangs from the vestibule arch; connections will be made after the doors are installed.
Photo 4: the new tile artwork for the school name is now fully exposed after tape temporarily securing it has been removed.
Photos 1-2: new tile artwork spelling out the school name has been installed above the vestibule; tape holds it in place while the adhesive cures. A crew member smooths out drywall tape on the walls in advance of painting.
Photo 3: view of the vestibule toward the new office framing.
Photo 4: looking down on the vestibule from the stairwell.
Photo 5: looking out at the vestibule from the office area.
Photos 1-3: the new, arched vestibule doorway has been sheetrocked and ready for finishing and addition of door frames.
Photos 1-3: the entry arch has been repeated in the new vestibule framing.
Photos 1 and 2: framing for the vestibule has been constructed.
Photo 3: part of the stairwell will be walled off to enclose the secured vestibule.
Photos 1-3: crew members finish construction of the new framing for the main office.
Photo 1: the front entrance is closed for the vestibule renovations.
Photos 2-3: the main office doorways have been removed as renovations begin.
Photo 4: new door and sidelight framing is set along the wall in preparation for installation.