Project Updates

Nov. 4, 2022

Photo 1: installation of the inner doors of the entry vestibule is now complete. Access security is in place, requiring electronic badge access to enter the rest of the building. Visitors are required to check in at the main office.

completed entry vestibule

Photo 2: students access the stairway to the second floor, beyond the secure entry vestibule.

students access stairway beyond entry vestibule

Photo 3: this view of the entry vestibule toward the main entrance shows how the arch feature has been repeated on the new inner doorway.

view of vestibule toward main entrance

Photo 1: the interior vestibule doorway has been installed and awaits final wiring and other finishing touches.

new vestibule doorway installed

Photo 2: the arched storefront at the top of the doorway showcases the tiled artwork for the school name.

top storefront glass

Photo 1: the new storefront for the interior vestibule doorway is expected to arrive later this month. In the meantime, a temporary barrier prevents visitor entry beyond the main office, where they are required to check in.

temporary barrier in entry vestibule

Photo 2: beyond the barrier is a temporary wall isolating the construction area from the rest of the school.

temporary wall in entry vestibule

Photo 3: the temporary wall also protects the adjacent, actively-used stairwell.

temporary wall on stairwell

Photos 1 and 2: construction plastic has been removed, opening up the vestibule and main office areas. The school is awaiting delivery and installation of storefront and doors to complete the vestibule. In the meantime, students will continue to be able to enter/exit via the dropoff doors during arrival and dismissal times.

opened-up vestibule area

view of opened-up vestibule area toward main entry

Photos 3 and 4: the main office is open for business! Staff has been moved in and now occupy the remodeled office area.

view of remodeled main office from vestibule

inside remodeled office area

Photo 1: doors have been installed for the main office entrances.

nearly-finished main office area

Photos 2 and 3: blinds have been installed on the office windows, and crew members finish assembly of the office furnishings.

office furniture assembly

finishing office furnishings

Photos 1-2: with painting completed, next steps are to install the new vestibule doors and finish the office reconfiguration.

painted vestibule

main office reconfiguration

Photos 1-2: a crew member adds masking tape on the vestibule walls to prepare for painting the window trim.

taping up office window trim

taping windows to prepare for painting trim

Photo 3: conduit for security wiring hangs from the vestibule arch; connections will be made after the doors are installed.

hanging conduit for security wiring

Photo 4: the new tile artwork for the school name is now fully exposed after tape temporarily securing it has been removed.

tile artwork for school name

Photos 1-2: new tile artwork spelling out the school name has been installed above the vestibule; tape holds it in place while the adhesive cures. A crew member smooths out drywall tape on the walls in advance of painting.

crew member preparing for painting of new vestibule

new tile artwork spelling school name above vestibule

Photo 3: view of the vestibule toward the new office framing.

view of office section

Photo 4: looking down on the vestibule from the stairwell.

view of vestibule from stairwell

Photo 5: looking out at the vestibule from the office area.

view of vestibule from office area

Photos 1-3: the new, arched vestibule doorway has been sheetrocked and ready for finishing and addition of door frames.

view of sheetrocked arch toward entry

view of sheetrocked arch from entry

view of sheetrocked arch from top of stairs

Photos 1-3: the entry arch has been repeated in the new vestibule framing.

view of vestibule arch framing from entry

view of vestibule arch framing toward entry

view of vestibule arch framing from stairs

Photos 1 and 2: framing for the vestibule has been constructed.

view of framed vestibule from entry

view of framed vestibule from stairs

Photo 3: part of the stairwell will be walled off to enclose the secured vestibule.

view of framed vestibule from inside office

Photos 1-3: crew members finish construction of the new framing for the main office.

view of new office framing from vestibule

view of new framing from inside office area

new framing in vestibule

Photo 1: the front entrance is closed for the vestibule renovations.

closed front entrance

Photos 2-3: the main office doorways have been removed as renovations begin.

front office wall removed

opened-up office area

Photo 4: new door and sidelight framing is set along the wall in preparation for installation.

framing set against wall

Photo 1: the interior vestibule doorway has been installed and awaits final wiring and other finishing touches.

new vestibule doorway installed

Photo 2: the arched storefront at the top of the doorway showcases the tiled artwork for the school name.

top storefront glass

Photo 1: the new storefront for the interior vestibule doorway is expected to arrive later this month. In the meantime, a temporary barrier prevents visitor entry beyond the main office, where they are required to check in.

temporary barrier in entry vestibule

Photo 2: beyond the barrier is a temporary wall isolating the construction area from the rest of the school.

temporary wall in entry vestibule

Photo 3: the temporary wall also protects the adjacent, actively-used stairwell.

temporary wall on stairwell

Photos 1 and 2: construction plastic has been removed, opening up the vestibule and main office areas. The school is awaiting delivery and installation of storefront and doors to complete the vestibule. In the meantime, students will continue to be able to enter/exit via the dropoff doors during arrival and dismissal times.

opened-up vestibule area

view of opened-up vestibule area toward main entry

Photos 3 and 4: the main office is open for business! Staff has been moved in and now occupy the remodeled office area.

view of remodeled main office from vestibule

inside remodeled office area

Photo 1: doors have been installed for the main office entrances.

nearly-finished main office area

Photos 2 and 3: blinds have been installed on the office windows, and crew members finish assembly of the office furnishings.

office furniture assembly

finishing office furnishings

Photos 1-2: with painting completed, next steps are to install the new vestibule doors and finish the office reconfiguration.

painted vestibule

main office reconfiguration

Photos 1-2: a crew member adds masking tape on the vestibule walls to prepare for painting the window trim.

taping up office window trim

taping windows to prepare for painting trim

Photo 3: conduit for security wiring hangs from the vestibule arch; connections will be made after the doors are installed.

hanging conduit for security wiring

Photo 4: the new tile artwork for the school name is now fully exposed after tape temporarily securing it has been removed.

tile artwork for school name

Photos 1-2: new tile artwork spelling out the school name has been installed above the vestibule; tape holds it in place while the adhesive cures. A crew member smooths out drywall tape on the walls in advance of painting.

crew member preparing for painting of new vestibule

new tile artwork spelling school name above vestibule

Photo 3: view of the vestibule toward the new office framing.

view of office section

Photo 4: looking down on the vestibule from the stairwell.

view of vestibule from stairwell

Photo 5: looking out at the vestibule from the office area.

view of vestibule from office area

Photos 1-3: the new, arched vestibule doorway has been sheetrocked and ready for finishing and addition of door frames.

view of sheetrocked arch toward entry

view of sheetrocked arch from entry

view of sheetrocked arch from top of stairs

Photos 1-3: the entry arch has been repeated in the new vestibule framing.

view of vestibule arch framing from entry

view of vestibule arch framing toward entry

view of vestibule arch framing from stairs

Photos 1 and 2: framing for the vestibule has been constructed.

view of framed vestibule from entry

view of framed vestibule from stairs

Photo 3: part of the stairwell will be walled off to enclose the secured vestibule.

view of framed vestibule from inside office

Photos 1-3: crew members finish construction of the new framing for the main office.

view of new office framing from vestibule

view of new framing from inside office area

new framing in vestibule

Photo 1: the front entrance is closed for the vestibule renovations.

closed front entrance

Photos 2-3: the main office doorways have been removed as renovations begin.

front office wall removed

opened-up office area

Photo 4: new door and sidelight framing is set along the wall in preparation for installation.

framing set against wall