2019 - Renovations

Aug. 6, 2019

Photo 1: installation of acoustic tile and electrical conduit in the gym is nearly complete.

gym renovation

Photo 2: the old boiler has been replaced by a much more efficient (and smaller!) unit.

replacement for old boiler

Photo 3: new drywall and paint cover up the updated domestic water pipe inside the wall.

domestic water pipe replacement in bathroom

Photo 4: a crew member fine tunes an HVAC unit in one of the offices.

tuning of office HVAC unit

Photo 5: a hallway looks brighter with new paneling and fresh paint.

hallway renovation

Photos 1 and 2: a renovated classroom starts getting the finishing touches with new wall panels and paint; upgraded HVAC ductwork overhead, along with digital controls, will provide more efficient ventilation.

renovated classroom gets finishing touches

HVAC ductwork overhead

Photo 3: new roofing is being installed.

roofing work

Photo 4: a worker installs acoustical tiles on the wall of the gym that will help dampen noise.

installation of acoustical tiles in the gym

Photo 1: The gym has been renovated and primed.

Renovated and primed gym

Photo 2: Roofing work continues.

Roofing work

Photo 3: The old boiler has been removed.

Old boiler removed

Photo 4: Crew brings in material for the kitchen ceiling.

Bringing in ceiling panel

Photos 5 and 6: Classroom walls are replaced with new backing and sheetrock.

Replacing classroom walls

Newly-sheetrocked classroom walls

Photo 7: New conduit brings in updated safety and electrical wiring.

Conduit replacement

Photo 8: Domestic water pipes are being replaced.

Bathroom pipe replacement

Crews are dismantling the old boiler, and will be removing it to prepare for installation of HVAC upgrades and controls. According to Laurie Lux, school office manager, the boiler was repurposed from a WWII ship when the school was built in 1948.

Dismantling old boiler

Work continues in the gym.

Construction work in gym

Teachers pack up their classroooms before work begins in the main building this summer.

Classroom packing

Crews have started working on the gym to implement seismic, HVAC and other improvements.

Work on gym improvements

Work on gym improvements