Project Archive

Dec. 23, 2021

Photo 1: temporary, protective fencing surrounds the perimeter of the building as landscaping is being installed.

temporary fencing around building

Photo 2: the entry vestibule is nearly complete with the installation of security measures and a skateboard rack.

entry vestibule

Photos 3 and 4: the main office area is receiving its final touches and paint touch-ups.

finishing main office area

identifying paint touch-ups in main office area

Photo 5: the main restroom is complete.

finished restroom

Photo 6: the office area has been finished and ready for furniture move-ins.

unfurnished office area

Photo 7: the extended learning area is complete.

finished extended learning area

Photos 1 and 2: a crew member trims up the newly-laid concrete walkway.

walkway at building entry

crew member trims concrete

Photo 3: the "9wood" ceiling has been added to the front entry vestibule.

wood ceiling added to entry vestibule

Photo 4: lighting installation is complete in the lobby area.

lobby lighting installed

Photo 5: the building also includes a shower and locker room.

shower and locker room

Photo 6: a crew member adds the base trim on the walls.

adding base trim to walls

Photo 7: wiring and other connections are being completed in the classrooms.

finishing wiring in classrooms

Photo 1: crew members construct a form for the concrete walkway that will be poured at the front entry of the building.

constructing form for concrete walkway

Photo 2: a panel is being painted white between the front windows.

painting exterior panel

Photo 3: lighting is being installed in the ceiling of the lobby.

lobby lighting installation

Photo 4: installation of the restroom fixtures is nearly complete, including mirrors above the sinks.

restroom mirrors installed

Photo 5: the '9wood' ceiling design is continued in part of the hallway.

9wood ceiling in hallway

Photos 6 and 7: whiteboards have been installed in the workroom and classrooms; tackboards and projector screens also have been mounted in the classrooms.

nearly-complete workroom

nearly-complete classroom

Photos 1 and 2: work on the exterior of the building continues with installation of the storefront entry door and concrete walkway at the front.

storefront entry door installed

concrete walkway installed at front

Photo 3: the "9wood" ceiling installation is completed in the lobby, providing a dramatic impression on visitors.

completed lobby ceiling installation

Photo 4: tilework is complete in the restroom area and sinks have been installed.

restroom tilework and sinks installed

Photo 5: the ceiling tile installation is nearly complete in the classrooms. Projectors and whiteboards have been installed.

classroom construction in progress

Photo 6: a crew member prepares a sink for installation in the classroom casework just behind him.

preparing classroom sink for installation

Photo 1: a view from the front entry shows a glimpse of the ongoing work in the lobby area.

view of lobby under construction from entry

Photo 2: slats of "9wood" are being installed in the ceiling grid in the lobby along with security hardware.

ceiling beam and security hardware installations

Photo 3: paneling has been installed in parts of the hallway, continuing the wood look.

paneling in building hallway

Photo 4: ceiling tiles are being installed in the classrooms.

ceiling tile installation in classroom

Photos 1 and 2: different views show the ongoing construction of casework in the lobby area. The first photo is the lobby as seen from the entrance; the second is the lobby toward the entrance.

view of lobby under construction from entry

view of lobby under construction toward entry

Photos 3 and 4: casework and interior doors have been installed in the classrooms and extended learning area.

casework in classroom

casework in extended learning area

Photo 5: outside, fencing is going up around the Oak Street and 5th Avenue sides of the campus. Walkways are framed, ready for a concrete pour.

fencing near street

Photo 1: crew members attach the gutters to the roof system.

attaching roof gutters

Photo 2: the ceiling grid has been installed in the entryway. Wiring coils out of installed panels for connections to the security system. The lobby is beyond the entrance.

ceiling grid in entryway

Photo 3: the ceiling grid has been completed in the lobby. The wood piled in the background at left will be installed in part of the ceiling. Casework for the desk area has been fabricated and is being installed.

ceiling grid and casework in lobby area

Photo 4: the workroom casework is completed.

casework in workroom

Photo 5: tile is being installed in the restrooms; this area is for the sinks in the main restroom.

tile installation in main restroom

Photo 6: ceiling grids are done and casework is starting to be installed in the classrooms.

casework starting in a classroom

Photo 1: exterior painting is complete with the addition of the contrasting grey color.

painted exterior of building

Photos 2-4: the concrete floors have been polished throughout the building, including the lobby area, offices and classrooms.

lobby with polished concrete floor

office with polished concrete floor

classroom with polished concrete floor

Photo 5: with interior painting completed, crew members install the hardware for the suspended ceiling grid.

installing ceiling grid hardware

Photos 1-2: painting of the building has begun, outside and inside. On the exterior, a deep "cardinal red" color has been applied; the remaining siding will be painted grey.

partially-painted building front

partially-painted building back

Photo 3: the lobby area is being painted a medium blue.

partially-painted building lobby

Photos 4-6: the classrooms and hallway are being painted in an off-white color.

partially-painted hallway

partially-painted classroom 1

partially-painted classroom 2

Photo 7: the medium-blue accent color is repeated in the extended learning area.

partially-painted extended learning area

Photos 1-5: most of the current work is taking place inside the building. HVAC ductwork as well as electrical and security cabling installations snake their ways across the ceilings as drywall finishers continue to smooth out the drywall mud on the seams. Here are photos of construction progress in the lobby area, corridor and classrooms.

drywalled lobby area with HVAC ductwork

drywall finishing in the lobby

HVAC ductwork in corridor ceiling

drywalled classroom 1

drywalled classroom 2

Photo 6: a crew member works on the wiring for a ceiling fixture.

installing electrical wiring

Photo 1: installation of the siding continues.

siding installation continues

Photo 2: drywall has been installed in the entry vestibule as electrical and security cabling continues.

entry vestibule under construction

Photo 3: the sheetrocked lobby area serves as a space for equipment and supplies.

lobby under construction

Photo 4: crew members apply drywall tape and mud in the building corridor.

finishing drywall

Photo 5: in one of the classrooms, a crew member applies insulating wrap around the HVAC ducts.

applying insulating wrap around HVAC duct

Photo 6: at the back of the building, exterior panels continue to be installed.

installing exterior panel

Photo 1: siding continues to be installed around the building exterior.

siding installation

Photo 2: the entry vestibule has been insulated and conduit for security cabling and other electrical wiring installed.

entry vestibule under construction

Photo 3: a team installs sheetrock boards on a classroom ceiling.

installing ceiling sheetrock boards

Photo 4: sheetrock covers half of the hallway as more boards stand ready to be installed.

sheetrock installation in hallway

Photos 5 and 6: ceiling cassettes will deliver HVAC into the classrooms. Insulation is being sheathed to prepare for sheetrock installation.

classroom under construction with exposed insulation

classroom under construction with sheathed insulation

Photos 1 and 2: roof panels are installed. Siding is starting to be installed over the weather-proofing sheathing.

aerial view of building exterior

installation of siding

Photo 3: inside, a crew member applies insulation to the perimeter walls.

installing wall insulation

Photo 4: HVAC condensate lines stream out from a central unit in the hallway ceiling.

HVAC condensate unit and lines

Photo 5: a crew member verifies measurements near piping.

measuring around piping

Photo 6: crew members work on overhead conduit and pipes in one of the classrooms.

working on overhead conduit

Photo 6: HVAC ductwork continues in the ceilings.

HVAC ductwork in ceiling

Photo 1: the frame for the entry vestibule door is installed.

installation of entry vestibule door frame

Photo 2: a crew member cuts pipe and conduit to the right size for installation.

cutting pipe

Photo 3: plumbing has been roughed in for the restroom.

roughed-in plumbing

Photo 4: installation of HVAC ductwork has started.

HVAC ductwork installation

Photo 5: in the ceiling, HVAC condensate lines are being assembled.

HVAC condensate lines

Photo 6: roofing work has begun and sheathing is complete.

sheathing at back of building

Photo 1: this aerial view shows the metal roofing parts stacked up, ready for installation, and weather barrier sheathing wrapping around the building exterior.

aerial view of roofing materials on building

Photo 2: a crew member takes measurements for the sheathing that will be attached to the building.

crew member measuring for sheathing

Photos 3 and 4: rough framing is completed for the entry vestibule and main office area where conduit is stored to be cut and installed.

framed entry vestibule

framed office area

Photo 5: this framed hallway leads to the classrooms and other spaces.

framed hallway

Photo 6: all the windows have been installed around the building, including in this classroom.

windows in framed classroom

Photos 1 and 2: framing is wrapping up inside the building, including interior door and sidelight window frames in the entry vestibule and classrooms.

entry vestibule framing

framing of classroom doors and sidelight windows

Photos 3 and 4: weatherproofing will be wrapped around the building over the next few weeks.

weatherproofing around front of building

weatherproofing around back of building

Photo 1: the base of the roof has been constructed and ready for installation of roofing materials.

aerial view over roof of building construction

Photo 2: inside the building, the entry and main office areas have been framed.

framed-out office area

Photos 3 and 4: classroom areas continue to be framed.

framing of larger classrooms

framing of smaller classrooms

Photo 1: the exterior of the building is framed and roof trusses installed.

exterior front of building

Photo 2: a crew member continues fastening the roof trusses to the building frame.

fastening roof trusses

Photos 3 and 4: framing of interior walls continues in the front entry/office area and the classroom section.

interior framing of office walls

interior framing of classroom walls

Photo 5: a crew member works on the roof structure over the classroom section.

working on roof section

Photos 1 and 2: roof trusses are lifted by crane to the top of the building frame

crane lift of roof truss

roof truss lifted to top of building

Photos 3 and 4: crew members position each truss into place over beams and at the sides of the building.

positioning roof truss over beam

positioning roof truss at side of building

Photo 5: as the roof trusses go up, work continues on cutting wood for the building frame.

cutting wood for building frame

Photo 6: wood is crisscrossed between sections of the building to support the walls under construction.

crisscrossed wall supports

Photos 1-4: wood framing for the building has started, beginning with exterior walls and moving into the interior.

overhead view of start of wood framing

aerial side view of building framing

framing on the southwest corner of the building

interior view of framing

Photos 1 and 2: the foundation is sprayed with water to slow evaporation from the concrete and to keep it moist as it is curing for maximum strength and to prevent cracking by curing too quickly, especially in excessive heat. Framing of the building is just starting around the foundation.

aerial view of foundation slab

start of building framing on foundation

Photos 1-3: after the foundation was poured very early in the morning, crew members smooth out the concrete surface and trim rough edges.

foundation slab for building

smoothing out concrete foundation surface

trimming rough edges from concrete foundation

Photos 1-3: the construction crew prepares the foundation for the modular building, including grading and compacting the gravel between the forms for concrete footings.

crew grades and compacts gravel for foundation

aerial view of foundation forms

loading gravel for foundation area

Photos 1-2: trenches for the foundation footings have been excavated. Further work is contingent on receipt of additional permits.

aerial view of foundation footing trenches

trenches for foundation footings

Photos 1-2: locations of foundation footings have been outlined. The crew begins trenching along those lines.

aerial view of foundation footing markings

trenching of foundation footings begins

Photos 1-2: the foundation pad has been graveled and graded. Sidewalk at the perimeter of the site has been demolished.

aerial view of foundation pad in place

sidewalk remains and foundation pad

Photos 1-3: the site is being excavated to prepare for the new building.

aerial view of preparatory site work

dirt is being loaded for removal

ground view of preliminary site work

Photo 1: pipes for a water line are ready to be installed.

water pipes on construction site

Photo 2: asphalt in the parking lot was cut to allow for boring of the building's water pipeline from the boiler room to the street service line.

pipeline boring area

Photo 3: stakes and painted markings outline areas for construction work.

stakes marking out construction site

Photo 1: this aerial view of the Miller Education Center-West campus shows the center's site at the top left, bordered by SE Oak St. and SE 5th Ave.

aerial view of MEC-West campus

Photo 2: a closer view of the site shows the contractor's erosion control measures in place to prepare the site for construction.

aerial view of center

Photo 3: a rendering of the building is superimposed on the site to illustrate its expected placement (not to scale).

construction site with superimposed rendering