Project Cost Estimates
These are the original estimates as presented in the bond promise. Scope may be added or subtracted as needs warrant and as opening up of buildings determines the full scope of needs. Project budgets will increase or decrease accordingly as well as adjust for prevailing costs of materials and labor. The project scope page has the most current information.
Goal / Project |
Estimated Cost |
|
|
School seismic upgrades School safety upgrades
|
$11,311,973 410,963 |
|
|
Current Infrastructure Improvements
|
|
|
|
Educational Technology (classroom)
|
528,262
|
Student Achievement
|
381,105
|
Total Investment |
$19,641,616 |
*Upon closer evaluation of the boiler, it was determined that the existing unit can still be adequately maintained for several more years, and a replacement is unnecessary at this time.