Project Scope
Please note that the preliminary site plan/design, project costs, and schedules may fluctuate due to cost of materials and labor, unforeseen and/or revised scope, conditions at the site, and other factors. Project costs: $18.9 million
COMPLETED
- Perimeter Fencing
Fencing was added/replaced in late fall 2021 around parts of the school to upgrade the perimeter of the campus.
- Tunnel Bracing
In August 2020, reinforcing braces were installed in a couple tunnels running underneath the building hallways to strengthen and alleviate some sagging of the floors.
- Building Security
Poynter's existing security systems was upgraded and enhanced in March 2020 with several additional measures, including:
- Entry security
- Card key access
- Security cameras
- Strobes
- Visual warning inside and outside the building
- Building Improvements
In four phases, from March to December 2019, Poynter received seismic, electrical service, roofing, and HVAC upgrades, including added air conditioning. Domestic water piping was replaced. Instruction continued throughout construction by housing classrooms in temporary portables as construction cycled in the building during each phase.
- New Furniture
In summer 2018, new furniture (FFE) was delivered to Poynter classrooms. This furniture is known to enhance the learning environment and increase student engagement.
Project Manager
Cornerstone Management Group
- Renovations: Casey Cunningham
Architect
- Renovations: Soderstrom Architects
Contractor
- Renovations: P&C Construction