Project Updates
Jan. 5, 2023
Photos 1-4: the fencing project has been completed with the addition of locks that prevent entry to the field area during school hours.
Photo 1: fencing mesh and lockable gates have been added at the side entrance and fire lane.
Photo 2: the fencing continues along the perimeter of the play field area to enclose it and securely separate it from the parking lot.
Photo 3: a gate at the southeast edge of the play field will have locking hardware added to prevent entry during school hours.
Photos 1 and 2: posts have been installed to add fencing along the perimeter of the play field to separate students from the parking lot and better secure the campus.
Photo 3: fencing fabric has been added to the new fence at the front of the school.
Photos 1 and 2: additional fencing is being installed along the perimeter of the south front of the campus to further secure this side.
Photos 1 and 2: security hardware installation and wiring for the new vestibule doorway have been completed. The doors and card entry access have been tested and are fully operational.
Photos 1 and 2: the new vestibule doorway is nearly complete. Once the card access reader and other security wiring are finished, the doorway will provide an extra barrier against unauthorized persons.
Photos 1 and 2: frames have been installed for the new vestibule doorway.
Photos 1 and 2: a crew member prepares for painting of the vestibule doorway, laying down protective tarp and taping around the edges.
Photos 1 and 2: sheetrock has been added over the framing for the new vestibule doorway. Security pathways are being installed for hooking up the new doors.
Photo 1: the front entry is closed while the entry vestibule is renovated to upgrade security and limit entry into the rest of the building.
Photos 2-3: framing for the second set of doors in the vestibule has been constructed.