Jan. 5, 2023

Photos 1-4: the fencing project has been completed with the addition of locks that prevent entry to the field area during school hours.

gate with lock

lockable gate near side entrance

view of finished fencing toward playground

view of finished fencing along perimeter of parking lot

Photo 1: fencing mesh and lockable gates have been added at the side entrance and fire lane.

fencing and gates at fire lane

Photo 2: the fencing continues along the perimeter of the play field area to enclose it and securely separate it from the parking lot.

fencing encloses play field area

Photo 3: a gate at the southeast edge of the play field will have locking hardware added to prevent entry during school hours.

new fencing and gate at southeast edge of play field

Photos 1 and 2: posts have been installed to add fencing along the perimeter of the play field to separate students from the parking lot and better secure the campus.

fencing posts installed around play field near building

fencing posts installed around play field along parking lot

Photo 3: fencing fabric has been added to the new fence at the front of the school.

new fencing at front of school

Photos 1 and 2: additional fencing is being installed along the perimeter of the south front of the campus to further secure this side.

fencing posts installed at front edge of school

fencing posts installed

Photos 1 and 2: security hardware installation and wiring for the new vestibule doorway have been completed. The doors and card entry access have been tested and are fully operational.

security-wired vestibule doors

view of new doorway toward main entry

Photos 1 and 2: the new vestibule doorway is nearly complete. Once the card access reader and other security wiring are finished, the doorway will provide an extra barrier against unauthorized persons.

nearly-complete vestibule doorway

view of new doorway toward main entry

Photos 1 and 2: frames have been installed for the new vestibule doorway.

view of new doorframes from entry

view of new doorframes toward entry

Photos 1 and 2: a crew member prepares for painting of the vestibule doorway, laying down protective tarp and taping around the edges.

laying painting tarp

taping around doorway for painting

Photos 1 and 2: sheetrock has been added over the framing for the new vestibule doorway. Security pathways are being installed for hooking up the new doors.

sheetrocked vestibule doorway

security pathways in vestibule frame

Photo 1: the front entry is closed while the entry vestibule is renovated to upgrade security and limit entry into the rest of the building.

front entrance

Photos 2-3: framing for the second set of doors in the vestibule has been constructed.

framing for second set of doors

view toward exterior doors