2022 - Entry Vestibule

Aug. 9, 2022

Photos 1 and 2: installation of security devices and hardware, including access card reader, enables full operation of the new vestibule doors.

operational vestibule doorway and access card reader

view of vestibule toward main entry

Photos 1 and 2: installation of security devices and hardware, including access card reader, enables full operation of the new vestibule doors.

operational vestibule doorway and access card reader

view of vestibule toward main entry

Photos 1 and 2: the new vestibule doorway is nearly finished, pending completion of security wiring. The added security will help prevent unauthorized access into the school building.

nearly-complete vestibule doorway

view of vestibule toward main entry

Photo 1: glazing has been added to the new vestibule doorways.

glazing on new doorways

Photo 2: a crew member adds pieces of the ceiling grid above the doorways so the tiles can be installed to cover the ducts and wiring.

adding pieces of ceiling grid

Photo 3: view of the new doorways toward the front entry.

view of new vestibule doors toward front entry

Photos 1 and 2: frames for the new doors have been installed.

new doorframes viewed from front entry

view of new doorframes toward entry

Photos 1 and 2: sheetrock has been added to the vestibule doorway framing.

sheetrocked vestibule doorway from entry

sheetrocked vestibule doorway (facing toward office)

Photos 1 and 2: pathways for the security wiring are installed; these will power the door access and tie into the monitoring system.

vestibule doorway framing

security wiring pathways

Photo 1: the front entrance has been closed for vestibule renovation.

closed front entrance

Photo 2: framing has been installed for the second set of vestibule doors that will provide upgraded security.

framing for vestibule doors

Photo 3: a crew member prepares for installation of pathways for the security wiring to the second set of doors.

preparing conduit path to security doors