2022 - Entry Vestibule
Aug. 9, 2022
Photos 1 and 2: installation of security devices and hardware, including access card reader, enables full operation of the new vestibule doors.
Photos 1 and 2: installation of security devices and hardware, including access card reader, enables full operation of the new vestibule doors.
Photos 1 and 2: the new vestibule doorway is nearly finished, pending completion of security wiring. The added security will help prevent unauthorized access into the school building.
Photo 1: glazing has been added to the new vestibule doorways.
Photo 2: a crew member adds pieces of the ceiling grid above the doorways so the tiles can be installed to cover the ducts and wiring.
Photo 3: view of the new doorways toward the front entry.
Photos 1 and 2: frames for the new doors have been installed.
Photos 1 and 2: sheetrock has been added to the vestibule doorway framing.
Photos 1 and 2: pathways for the security wiring are installed; these will power the door access and tie into the monitoring system.
Photo 1: the front entrance has been closed for vestibule renovation.
Photo 2: framing has been installed for the second set of vestibule doors that will provide upgraded security.
Photo 3: a crew member prepares for installation of pathways for the security wiring to the second set of doors.