Bond Update: Ladd Acres Gym

April 12, 2021 - The roof has been installed on the new gymnasium at Ladd Acres Elementary School as exterior sheathing and waterproofing work continues.


Actualización del bono: Gimnasio de Ladd Acres
Se ha instalado el techo en el nuevo gimnasio de la Escuela Primaria Ladd Acres mientras se continúan los trabajos de revestimiento exterior e impermeabilización.

Photo 1: crew members start installing the roof panels over the gym.

installing roof panels on gym

Photo 2: this view shows the underside of the roof panel installation so far.

view under partially-installed roof panels

Photo 3: the interior steel columns and beams of the gym have been painted. Additional framing hardware is ready to be installed for the gym interior and ceiling.

interior view of gym's painted steel

Photo 4: the rooms under the mezzanine (for custodian, electrical and PE office) are being framed. The door in the foreground is for an ADA-accessible bathroom.

framing of rooms under mezzanine

Photo 5: waterproofing sheets are applied to the exterior sheathing.

applying exterior waterproofing sheets