20201208

Photo 1: stucco areas at the front of the school are being repatched as a preventive measure against moisture intrusion.

repatching stucco walls

Photo 2: furniture awaits arranging in the remodeled front office.

front office furniture to be arranged

Photo 3: a new countertop and dishwasher was installed in the staff break room.

staff break room