20211018

Photos 1-2: these aerial photos show the extent of site work so far. The dropoffs/parking lots have been curbed and paved. Site work in the building area includes addition of base rock and the start of utility trenching.

aerial view of site work toward the east

aerial view of site work toward the west

Photo 3: crew members work in a shored trench to lay storm drain pipe to the catch basin in the parking lot. Shoring keeps the trench walls from collapsing on the workers.

laying pipe in utility trench