20211201

Photo 1: the site is ready to be turned over for the building construction in spring 2022.

aerial view of completed site

Photo 2: fencing has been completed around the synthetic turf field area and a concrete walkway has been constructed from the north neighborhood into the campus.

fencing completed around synthetic turf field area

Photo 3: parking lot light bases have been installed and wired in both the staff and visitor/parent parking lots.

parking lot light bases