20221229

Photo 1: sheathing now covers the entire back of the building.

sheathing installed around back of building

Photos 2 and 3: HVAC ductwork is being installed in the kitchen area.

HVAC ductwork in kitchen area

installed ductwork in kitchen area

Photo 4: the view of learning street to the west. Classrooms are to the left and the gym and cafeteria to the right.

view of learning street to west

Photo 5: the view of learning street to the east. The cafeteria is at the near left, the gym is at the center, and the administration wing is ahead.

view of learning street to the east